Page 43 - MACHINE TOOLS WORLD - DECEMBER 2021
P. 43

CASE STUDY





























           dedicated solutions to ensure maximum   Italian headquarters, therefore it all worked   Management Team of the company
           productivity of CS Wind Malaysia”, says   out really well, “ confirmed CS WIND
           Diego Morbini, Technical Sales Manager   Malaysia Management Team     THE COMPANY
           and part of Faccin WT division.                                       Faccin, a brand of the Faccin Group,
                                              Cooperation with the Italian       is proud of producing machines that
           The installation process was easier   supplier                        contribute to the green energy production
           than expected                      It is the first time that CS Wind   and believes in the future of the industry.
           The installation at CS Wind Malaysia   collaborates with the Faccin Group for the   Throughout its Wind Division, experienced
           facilities was very efficient. “The   supply of a plate rolling line.  engineers ensure a smooth interface
           commissioning, start-up and training   “We had an excellent collaboration.   with the different areas of the company
           process was simpler than expected,   Faccin delivered the equipment on time   with the aim of creating technologically
           considering the difficult situation due   even when we had a very tight schedule   advanced solutions for manufacturers
           to the global pandemic.” During the   and provided a team that had the right   of wind towers, wind foundations, wind
           installation, Faccin’s technical team   level of experience for the installation,   tower flanges and wind tower door
           made sure the operators and CS Wind   training, and commissioning, thus   frames.
           maintenance technicians were all involved,   guaranteeing all the requirements of this
           to train them on how to thoroughly service   project. Based on these positive results,   Join us in STEELFAB – UAE
           and maintain the equipment to ensure   we would like to continue the collaboration   Jan 10-13, 2022. We’ll be at stand
           optimal performance. “The Faccin team   with Faccin for the development of   6-4216, plan to stop by or email us
                                                                                  at info@faccingroup.com to schedule
           showed prompt and professional support   production plants for towers of greater   an appointment.
           on site and effective support from the   diameters and weights”, concludes the


























           www.mtwmag.com                                                  DECEMBER 2021    MACHINE TOOLS WORLD       37
   38   39   40   41   42   43   44   45   46   47   48