Page 16 - 41 Moda Ln, Atlanta, GA 30316
P. 16

THE SOUTHERN EXTENSION
        Currently, the Southside Interim Trail is open as an unpaved, interim trail, providing
        connectivity between the paved Eastside and Westside Trails. Plans to build out the
        Southside Trail are moving forward, with the first phase of construction efforts focused on
        the portion extending from the southern end of the Westside Trail eastward toward the
        Connector.


        WHAT’S HAPPENING NOW
        The Southwest Connector Spur Trail is part of a larger trail network that connects
        neighborhoods in southwest Atlanta to the Westside Trail. When completed, this network
        will be 4.5 miles. It is part of the Atlanta BeltLine’s 33-mile trail network.


        THE WESTSIDE TRAIL
        EXTENSION IS NOT
        YET OPEN. In August
        2018, the City of Atlanta
        and Atlanta BeltLine,
        Inc. purchased 1.8
        miles of former railroad
        corridor on the westside
        informally known as “the
        Kudzu Line.” This stretch
        will extend the existing
        Westside Trail and
        connect to the Westside
        Connector, currently
        in development by the
        PATH Foundation.
   11   12   13   14   15   16   17   18   19   20   21