Page 124 - ssr_16
P. 124
It has numerous notice-boards as well. College premises are under CCTV
surveillance.
Before the end of the even semester, planning for the next academic year begins.
Each department conveys to the Principal information about its infrastructural
requirements. This includes size of classrooms and laboratory requirements. The
Principal, in turn, discusses these matters with the management and Finance Officer,
and draws out a plan for upgradation of facilities. Maintenance work, including
painting College building, is carried out during summer vacation. College timetable is
prepared with great care to ensure the optimum utilization of available classrooms
with maximum possible convenience to students and teachers.
4.1.2. Does College have a policy for creation and enhancement of infrastructure
in order to promote a good teaching-learning environment? If yes, mention a few
recent initiatives.
Expansion and development of infrastructure and learning resources on campus to
meet future development needs is one of the major concerns of College. College does
have a policy for creation and enhancement of infrastructure, as it is convinced that a
good physical environment is important for promoting good teaching-learning
experiences. The management has upgraded the infrastructure from time to time,
keeping in view the new generation of students and their learning needs. College has
taken several initiatives to create and enhance infrastructural facilities during the past
five years. With this objective in mind, College has provided spacious lecture rooms,
LCD projectors for almost all classes, overhead projectors, slide projectors, online
gadgets, Computer Centre and language labs so as to ensure adequate availability of
physical infrastructure and its optimal utilization. Table 4.1 below shows the
additions made to the existing infrastructure in the assessment period.
Table 4.1: Additions Made to Existing Facilities 2012-2016
Facilities UG-HBlock UG-S Block PG Block
Existing Addition Existing Addition Existing Addition
1. Class Rooms 20 14 22 02 16 12
2. Research Labs - - - - 08 02
3. Labs 00 03 33 05 16 05
4. Instrumentation - - 02 - 00 03
Rooms
5. Library 01 - -- - 01 -
6. Studio - - 00 02 01 01
7. Board Room 00 01 - - - -
8. Admin/Dept/Staff 06 10 24 01 12 01
Room
9. Conference Halls - - 02 04 01 -
10. Green Rooms - - 00 02 - -
11. Wash Rooms 06 02 06 - - -
12. Expansion of 100.33 -
2
Examination Wing m
Any other 2 ATMs & Bank Counter
120

