Page 55 - Bi-National Socioeconomic Handbook 2020 Laredos Region
P. 55
Community Center
Mujer Total
Urban Mobility and Modernization Repaving on San Miguel Boulevard between Las Torres
In regards to the main plans for public works development of Boulevard and Dia del Trabajo street, at “Villas de San
parks, plazas or sports centers, we are currently building: Miguel” Sector.
Repaving on Dos Laredo Boulevard between Las Torres
Boulevard and Rheem Industries.
7th Soccer field at the School of Commerce of Universidad
Autónoma de Tamaulipas (UAT). Repaving on Eva Samano between 2 de Abril and
Park at “Valles de Anahuac” Sector. Manzanillo street, “Bertha del Avellano” sector.
Coverage of concrete and asphalt paving 49,572.70m2 (55
Park at “Nueva Era” Sector, on Carmen Serdan Street
blocks).
Coverage of concrete paving 56,551.41m2 (63 blocks).
Coverage of asphalt paving 32,506.10m2 (36 blocks).
Soccer Field Faculty of Commerce
Road Infrastructure Development
In order to improve communication of the urban area, we have
included within the projects of paving, resurfacing, repaving
and modernization of units, the following works:
Redevelopment of the Paseo Loma Real street between Redevelopment of Paseo Loma Real street
the Old National Highway and Luis Donaldo Colosio
Boulevard.
Don Leon Boulevard between Universidad Boulevard and
El Campanario.
Repaving of Street 16 between 13th Avenue and 5th
Avenue in “Valles de Anahuac” Sector.
Repaving of Nueva Victoria Street between Premio and
Artículo 20 streets, “Nueva Victoria” Sector.
Bi-National Socioeconomic Handbook “Laredos Region“ 41