Page 11 - efile_CMH-Momentum_2015-2016
P. 11

Innovation Wing

 before

The upper level of the southwest wing of
the building, previously the math wing, was
renovated to create a 21st Century Learning
Center. Seven Innovation Labs were created
for interdisciplinary classes in rooms that are
collaborative and flexible. Each classroom
has a break out space connected to it. The
new board room is also located in the
Innovation Wing. Construction began at the
end of May 2015 and was completed prior
to the beginning of the second semester in
January 2016.

                                                 11
   6   7   8   9   10   11   12   13   14   15   16