Page 13 - Leshobo Technical Report_October2016
P. 13

Technical Report for the

                                           LESHOBO LIMESTONE

                                                    Taung, North-West Province

Figure 1.2: The locality map of the project area, the project area is shown by the
red polygon on the map.

                                                                  04
   8   9   10   11   12   13   14   15   16   17   18