8.2.3.2. The Tonnages to be Produced by the Mining and Processing
        Equipment
        (a) Mining and Loading to ADT Trucks

REFRACTORY PURPOSE                                  CEMENT MANUFACTURING PURPOSE

Yellow  Daily Produc?  Prod.@full      Prod@        Yellow  Daily Product Prod.@full      Prod@
                       capacity        70%capacity                                        70%capacity
Fleet   Hrs on         =(AxBx26 days)  =(C x 0,7)   Fleet   Hrs ion       capacity        =(C x 0,7)

        Rate/Hr        C               D                          Rate/Hr =(AxBx26 days)  D
                       84 240          58,960                                             58,960
        (Tons)         46 800          32 760                     (Tons)                  0

        AB                                                  AB            C               58960

70 Ton Exc. 18 180                                  70 Ton Exc 18 180     84 240

40 Ton Exc 18 100                                   40 Ton Exc 0  0       0

Totals  18 280         131 040         91 720               18 180        84240

        This table A suggests that:

        • Topbram Initiatives will be using Two Excavators for mining and loading on to the ADT
        trucks.

        • The Two Excavators will mine and load 91 720 (in the case of Mining for a refractory
        client)Tons of Lime on to ADT Trucks which will deliver on to a stockpile meant for
        Crushing and Screening

        • In the event of a Cement Manufacturing Client the One Excavator will be used for
        Mining and Loading on to the ADT Trucks. The trucks will at least load 58 960 Tons of
        Lime to the Crushing and Screening Department.