8.2.3.2. The Tonnages to be Produced by the Mining and Processing
Equipment
(a) Mining and Loading to ADT Trucks
REFRACTORY PURPOSE CEMENT MANUFACTURING PURPOSE
Yellow Daily Produc? Prod.@full Prod@ Yellow Daily Product Prod.@full Prod@
capacity 70%capacity 70%capacity
Fleet Hrs on =(AxBx26 days) =(C x 0,7) Fleet Hrs ion capacity =(C x 0,7)
Rate/Hr C D Rate/Hr =(AxBx26 days) D
84 240 58,960 58,960
(Tons) 46 800 32 760 (Tons) 0
AB AB C 58960
70 Ton Exc. 18 180 70 Ton Exc 18 180 84 240
40 Ton Exc 18 100 40 Ton Exc 0 0 0
Totals 18 280 131 040 91 720 18 180 84240
This table A suggests that:
• Topbram Initiatives will be using Two Excavators for mining and loading on to the ADT
trucks.
• The Two Excavators will mine and load 91 720 (in the case of Mining for a refractory
client)Tons of Lime on to ADT Trucks which will deliver on to a stockpile meant for
Crushing and Screening
• In the event of a Cement Manufacturing Client the One Excavator will be used for
Mining and Loading on to the ADT Trucks. The trucks will at least load 58 960 Tons of
Lime to the Crushing and Screening Department.