4) DEFECT LIABILITY PERIOD



          WHAT IS DEFECT LIABILITY PERIOD




              The Defect Liability Period (“DLP”) is defined as a period where the Developer is
              responsible to fix any defects and it begins from the date the Homeowner received
              delivery of vacant possession and keys of the property.




                                       CLASSIFICATION OF DEFECTS














          Patent Defect: The defect that can be                          Latent Defect: The defect that is not
          discovered by normal examination or                            discovered by normal examination or
         testing. It’s discoverable in a structure                       testing which manifests itself after a
        that is apparent to reasonable inspection                        period of time. It is something that is

        i.e roof leak, foundation crack. Normally,                          not easily discoverable and only
        defects are readily apparent to the naked                      becomes apparent at some later date or
         eye and are therefore capable of being                              upon an investigation of some
         assessed and measured relatively easily                          consequential effects caused by the
                        and rectified.                                                    defect.




          CONSTRUCTION DEFECTS



              Construction defects are inevitable in construction project delivery and are usually
              contentious between the employer and the contractor/subcontractor. It is the
              unacceptable quality of a project which can be identified and remedied. It also means as
              work that fell short of complying with the express description or requirement of the
              contract, especially any drawing or Specification together with any implied term and
              condition as to its quality, workmanship, durability, aesthetic, performance, or design.



             Therefore, the project faces the defect work generally resulting in a structure that
             cannot perform its original intended roles.