QUALITY, CONTRACTS & AGREEMENTS















     Technical directives                  Designs                              Changes
     All construction is following NEC3 agreement   All designs are ™ Cargo Creatives and shaped by   Any addition or modification in currently agreed
     standards                             our in-house designers and architects, copies of   plan must be pre discussed and agreed by both
                                           working drawings, electrical plan and technical   Parties, and subsequent cost incurred by the
     Environment                           material list will be given to buyer time of   changes shall be borne by the buyer
     Materials used and procedures include laws   completion
     and policies addressing water and air
     pollution, chemical and oil spills, smog,   Purchase amount and fees       Force Majeure
     drinking water quality, land conservation and   Agreed upon purchase amount is Rp...  consists   Critical delays caused by any party other than
     management, and wildlife protection, such as   of a deposit 10% (non-refundable) and   Force Majeure, (heavy rain considered as
     the protection of endangered species.  structural down payment 25%, 20%, 20%   Non-compensable claims) injury, death or loss, legal
                                          20%, 5% throughout constructional     matter affecting the CPM, the project completion
     General                              progression. Notary fees are paid by the buyer   date will be subject to compensation rate 1% per
     This description should be considered in   (1%), Buyer can appoint         week of delay of total amount stated in section
     conjunction of floor plans and specifications.  Administrator/Notary/legal advisor to assent   “Purchase amount and fees”
     Finishes, fixes & textures will be found in   and lead due diligence efforts.
     specifications regarding flooring, walls,   Total purchase amount includes architectural-   Arbitration
     roofing and interior. Structure is made of   engineering and construction costs, IMB license,   Any such dispute that cannot be resolved within 30
     reinforced concrete and steel beams/ceilings   affiliations electricity and water supply   (thirty) days after the matter in dispute has been
     of aluminium frames, panels and gypsum.   installations.                   brought by one Party to the attention of the other
     Ceiling height is minimum 335cm (technical   Purchase amount (95%) must be paid into   Party  should,  at  the  election  of  either  Party,  be
     floor plans). Tempered glass is used for   sellers client account before hand over of keys   resolved by arbitration in the Indonesian language
     windows accordingly to working drawings.  in following manner (above mentioned payment   under  BANI  (Indonesian  Arbitration  Body)  Rules.
     Downlights and spotlight are used as primarily   structure):               Both  Parties  are  entitled  to  make  written
     light source (electrical planning)                                         submissions to the arbitrator so appointed upon the
                                                                                subject matter of the dispute.  The decision of BANI
     Parking & Entrance                   Deposit, Signing ITL, NEC3   Rp       shall be final, binding and incontestable and may be
     Pavers used is paver-blocks, grey/red.   1st Payment, Clear Due Diligence   Rp   used as a basis for judgment thereon in Indonesia
                                                                                or elsewhere.
     Electrical socket will be installed & lightning  2nd Payment      Rp
     Gate structure -  hollow steel frame, wooden   3rd Payment        Rp       ETA
     covers, integrated door/agreed upon  4th Payment                  Rp       Constructional substantial completion 10 months
                                          Final Payment, 3 months completion  Rp    after 1st payment, buyer providing
     Locks & Keys                                                               certificate/punch list of substantial completion,
     We ensure every lock will only work with the                               Final completion within a reasonable period of time,
     final key (the site supervisors key to make   Completion                    ETA 11 months.
     sure his key no longer works). All the locks,   The making of final payment shall constitute a
     and keys work properly.              waiver of all claims by the first party except   Signatures
                                          those arising from (1) unsettled claims, (2)
     Agreement/Object                     faulty or defective Work appearing after   This  agreement  is  made  in  2  (two)  copies  with
     The Villa unit will be hand over accordingly,   Substantial Completion, (3) failure of the Work   sufficient  stamp  duty,  signed  by  the  parties  in  a
        master land certificate number and/or master   to comply with the requirements of the scope of   conscious,  physically  and  mentally  healthy
     leasehold agreement, transfer of leasehold   work, or (4) terms of any special guarantees   condition and without coercion from any party.
     agreement, working drawings, floor plans,   required by the scope of work. The acceptance
     material list and electrical planning,   of final payment shall constitute a waiver of all

     Building License                     claims by the second party except those
                                          previously made in writing and still unsettled.
     All buildings constructed by Cargo Creatives
                                          5% - in amount Rp… is paid to sellers client
     comes with a IMB License. Holding an IMB
     means that you are permitted to build a   account 3 months after construction
     property for your Airbnb villa rental.  completion/handover of keys