SECTION 5.0 – ARCHITECTURAL COMPONENTS, MATERIALS AND FINISHES   SECTION 5.0 – ARCHITECTURAL COMPONENTS, MATERIALS AND FINISHES



                        5.8.5     Doors at VIP rooms, auditoriums, conference rooms, meeting rooms, and
 5.7.23   Operating  Theatres  if  located  at  the  building’s  perimeter,  the  external   all main entrances shall be of solid timber or solid core construction with a
 windows  shall  be  provided  with  double  glazing  panels  to  avoid   minimum of 40 mm thickness. They shall conform to the latest MS 1506
 condensation.                    and wooden door frames conforming to the latest MS 1508.

 5.7.24   External glass for external walls and windows shall be of low shading   5.8.6   Doors shall not obstruct or encroach into any circulation or movement of
 coefficient and low emissivity.   equipment/panel/furniture.  When open 180° or full swing of door leaf
                                  opening  are  essentially  considered  unless  it  constrains  the  limitation  of
 5.7.25   Insect net screen shall be provided complete with aluminium framing and   space approved and the PD’s concurrence. The door swing shall comply
 mounted to openings/windows in non-air-conditioning areas for habitable   with the fire regulations.
 rooms. The screens  shall be securely clipped and fixed to  the
 openings/windows and demountable for easy cleaning and maintenance.   5.8.7   Single leaf door width shall not be less than 900 mm clear opening, and
                                  double leaf door width shall not be less than 1500 mm clear opening to
                                  ease movement for humans, wheelchairs, and equipments. Single leaf door
 Internal Glass Panel             width for service duct shall not be less than 600 mm clear of opening.  The
                                  door height shall not be less than 2100 mm clear of opening.
 5.7.26   One-way glass panels shall be designed at selected rooms as identified by
 the Client.            5.8.8     In areas where the doors are liable to water splashing (e.g., cubicle toilet
                                  doors, wet utility rooms, etc.), the doors shall be a minimum thickness of 12
 5.7.27   The internal glass panel with adjustable vertical blind between the glass   mm water-resistant phenolic resin boards with a proprietary anti-rust fixing
 panel gaps shall be provided in between ICU bays or other areas/rooms   system according to manufacturer’s instructions.  The frames to such doors
 identified by the Client or otherwise specified.   shall be lifted with 150 mm high concrete heel (i.e., stones for protection
                                  against rusting/rotting due to wetness). PVC doors are strictly not
 5.7.28   Full height internal glass shall be installed at 150 mm from finish floor level,   acceptable.
 complete with wall and glass protection.
                        5.8.9     Approved door  seals or sweeps shall be provided underneath doors
 5.7.29   All glass panel between the air-conditioned and non-air-conditioned area   between air-conditioned and non-air-conditioned areas, where applicable.
 shall be constructed  double glazed  to  reduce/eliminate  the risk of
 condensation.          5.8.10    Composite aluminium louvered doors shall be provided for utility rooms,
                                  plant rooms, and all other rooms requiring natural ventilation or fresh air
                                  change cycle. For sensitive equipment/instrument rooms, anti-vermin
 5.8   DOOR                       netting shall be fixed and fastened inside the louvered door panels.  Sizing
                                  shall be appropriate, and netting colour shall blend with the overall scheme
 5.8.1   All doors shall  comply  with  the latest  JKR Standard Specification for   to the PD’s concurrence.
 Building Works.
                        5.8.11    Aluminium frame sliding glass door,  when used,  shall  conform with MS
 5.8.2   Unless otherwise specified, all doors shall be of hollow-core or honeycomb   1017.
 timber construction with 40 mm minimum thickness.
                        5.8.12    Access card  system-controlled  door  shall be  provided  wherever  it is
 5.8.3   External doors shall be protected from weather elements. The doors shall   specified/required.    The  location  and  position  of  the  system  shall  not
 be recessed inwards or shielded by eaves or canopies. The door finishes   jeopardize the architectural aesthetic. (Refer to Electrical Works Brief).
 shall be manufactured with Moisture Resistant (MR) Bond and Weather and
 Boil Proof (WBP) bond, respectively, in compliance with MS 228.    5.8.13   Non-corrosive roller shutter doors/grilles shall be motorised with manual
                                  override of approving and durable type.  Roller shutter doors/grilles shall be
 5.8.4   All external doors shall be finished with weatherproof paint.   provided at areas such as the central refuse chamber, services rooms, and
                                  other applicable areas.



 44                                                                                                     45
 2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT   2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT
   49   50   51   52   53   54   55   56   57   58   59