Page 24 - Knit Now - Issue 112 (January 2020)
P. 24

Row 6: Sl 1, puso, cast off 2 (2,   Work 9 (13, 25, 7, 5, 3, 3, 3, 3)
                                                                  2, 2, 2, 3, 3, 3, 3) more sts,   rows in Garter Rib.
                                                                  work in patt to last st, turn.  Rep inc row.
                                                                Row 7: Sl 1, puso, cast off 5 (5,   Rep these 10 (14, 26, 8, 6, 4,
                                                                  6, 7, 8, 9, 10, 10, 10) more   4, 4, 4) rows 5 (3, 1, 6, 8, 12,
                                                                  sts, work in patt to last st, turn.  11, 13, 13) more times. 44 (44,
                                                                Row 8: Sl 1, puso, cast off 2   48, 52, 60, 64, 68, 72, 76) sts
                                                                  more sts, work in patt to last   Cont in patt until sleeve
                                                                  st, turn.                 measures 41 (41, 42.5, 42.5,
                                                                Row 9: Sl 1, puso, cast off rem sts.  42.5, 42.5, 42.5, 42.5, 42.5)
                                                                Break yarn and fasten off.  cm or desired length, ending
                                                                                            after a WS row. Cast off.
                                                                SLEEVES                     Making up: Block pieces to
                                                                Work both the same          measurements given in table.
                                                                With smaller needles, cast on   Join both shoulder seams.
                                                                40 (44, 48, 48, 52, 52, 56, 56,
                                                                60) sts.                    Neckband
                                                                Work 15 rows in 2x2 rib.    With RS facing, DPNs and
                                                                Change to larger needles.   starting at Right Shoulder seam,
                                                                Next Row (WS, dec): K0 (2, 0,   pu and k80 (84, 84, 88, 88, 92,
                                                                  0, 2, 2, 0, 0, 2), [k2 (2, 6, 2,   92, 96, 96) sts evenly around
                                                                  2, 2, 2, 2, 2), k2tog] 10 (10,   neckline. Pm and join to work in
                                                                  6, 12, 12, 12, 14, 14, 14)   the rnd.
                                                                  times, k to end. 30 (34, 42,   Work 6 rnds in 2x2 rib.
         Stacey says…                                             36, 40, 40, 42, 42, 46) sts  Cast off.
                                                                Next Row: Knit.
                                                                Work 9 (15, 19, 11, 9, 3, 7, 5,   Finishing
                                                                5) rows in Garter Rib       Set sleeves into armhole
                                                                Next Row (RS, inc): Kfb, k to   opening. Join side and sleeve
                                                                  last st, kfb. 2 sts inc’d  seams. Weave in all ends.


                                               6-stitch Cable       Small Wave Cable                Key




         “I love textures that look more
         complicated than they are.
         While the setup of the Traveller
         Pullover may seem challenging,
         the stitch paterns are not.
         They have a nice rhythm with
         short repeats, making them
         easy to memorise. It won’t take
         long to relax into the rhythm of
         the stitches”


           Front Cables















          Step 1: Work to the point at   Step 2: Slip required number of   Step 3: Work stitches from LH   Step 4: Work stitches from
          which your cable begins. Make   stitches from LH needle onto   needle onto RH needle.  cable needle onto RH needle.
          sure your working yarn is at    cable needle and hold in front.
          the back.


         24   www.knitnowmag.co.uk
   19   20   21   22   23   24   25   26   27   28   29