Page 24 - Knit Now - Issue 112 (January 2020)
P. 24
Row 6: Sl 1, puso, cast off 2 (2, Work 9 (13, 25, 7, 5, 3, 3, 3, 3)
2, 2, 2, 3, 3, 3, 3) more sts, rows in Garter Rib.
work in patt to last st, turn. Rep inc row.
Row 7: Sl 1, puso, cast off 5 (5, Rep these 10 (14, 26, 8, 6, 4,
6, 7, 8, 9, 10, 10, 10) more 4, 4, 4) rows 5 (3, 1, 6, 8, 12,
sts, work in patt to last st, turn. 11, 13, 13) more times. 44 (44,
Row 8: Sl 1, puso, cast off 2 48, 52, 60, 64, 68, 72, 76) sts
more sts, work in patt to last Cont in patt until sleeve
st, turn. measures 41 (41, 42.5, 42.5,
Row 9: Sl 1, puso, cast off rem sts. 42.5, 42.5, 42.5, 42.5, 42.5)
Break yarn and fasten off. cm or desired length, ending
after a WS row. Cast off.
SLEEVES Making up: Block pieces to
Work both the same measurements given in table.
With smaller needles, cast on Join both shoulder seams.
40 (44, 48, 48, 52, 52, 56, 56,
60) sts. Neckband
Work 15 rows in 2x2 rib. With RS facing, DPNs and
Change to larger needles. starting at Right Shoulder seam,
Next Row (WS, dec): K0 (2, 0, pu and k80 (84, 84, 88, 88, 92,
0, 2, 2, 0, 0, 2), [k2 (2, 6, 2, 92, 96, 96) sts evenly around
2, 2, 2, 2, 2), k2tog] 10 (10, neckline. Pm and join to work in
6, 12, 12, 12, 14, 14, 14) the rnd.
times, k to end. 30 (34, 42, Work 6 rnds in 2x2 rib.
Stacey says… 36, 40, 40, 42, 42, 46) sts Cast off.
Next Row: Knit.
Work 9 (15, 19, 11, 9, 3, 7, 5, Finishing
5) rows in Garter Rib Set sleeves into armhole
Next Row (RS, inc): Kfb, k to opening. Join side and sleeve
last st, kfb. 2 sts inc’d seams. Weave in all ends.
6-stitch Cable Small Wave Cable Key
“I love textures that look more
complicated than they are.
While the setup of the Traveller
Pullover may seem challenging,
the stitch paterns are not.
They have a nice rhythm with
short repeats, making them
easy to memorise. It won’t take
long to relax into the rhythm of
the stitches”
Front Cables
Step 1: Work to the point at Step 2: Slip required number of Step 3: Work stitches from LH Step 4: Work stitches from
which your cable begins. Make stitches from LH needle onto needle onto RH needle. cable needle onto RH needle.
sure your working yarn is at cable needle and hold in front.
the back.
24 www.knitnowmag.co.uk

