Page 2 - pts32 Annual pipeline & structural integrity report 2020
P. 2
T A B L E O F C O N T E N T S
02
PIPELINE AND STRUCTURAL SECTION :
ORGANISATION CHART
03
PMA : FACILITIES LAYOUT
04
PMA : PIPELINE ASSET OVERVIEW
05
PMA : OFFSHORE ASSET OVERVIEW
(STRUCTURAL)
06
0 8 1 2 1 4
PMA : ONSHORE ASSET OVERVIEW (CIVIL)
07
ANGSI (PPO-S): PIPELINE AND
STRUCTURAL INTEGRITY REPORT BY FIELD
32
DULANG (PPO-L) : PIPELINE AND
STRUCTURAL INTEGRITY REPORT BY FIELD
48
DUYONG (PPG-D) : PIPELINE AND
STRUCTURAL INTEGRITY REPORT BY FIELD
62
PM9 (PPG-P) : PIPELINE AND STRUCTURAL
INTEGRITY REPORT BY FIELD
3 1 2 3
95
PNLP (PPO-F) : PIPELINE AND STRUCTURAL
INTEGRITY REPORT BY FIELD
108
RESAK & TBC (PPG-D) : PIPELINE AND
STRUCTURAL INTEGRITY REPORT BY FIELD
122
TERMINAL (PPT) : PIPELINE AND
STRUCTURAL INTEGRITY REPORT BY FIELD
136 6 9
5 0
PIPELINE: PTS32 ACHIEVEMENT 2019
137
STRUCTURAL: PTS32 ACHIEVEMENT 2019
137
CIVIL: PTS32 ACHIEVEMENT 2019
THE INFORMATION IN THIS BOOKLET IS INTENDED FOR GENERAL INFORMATION AND
QUICK REFERENCE OF PMA PIPELINES,OFFSHORE PLATFORMS AND ONSHORE
TERMINAL FACILITIES. THE INFORMATION IS DEEM ACCURATE TO A CERTAIN DATE AS
INSPECTION AND MAINTENANCE ACTIVITIES ARE CONTINUOUS ONGOING PROCESS.
HENCE THIS DOCUMENTS SHALL NOT BE USED AS REFERENCE FOR ANY DETAIL
ASSESSMENT IE ENGINEERING AND AUDIT ACTIVITY. LATEST INFORMATION TO THE
EXISTING STATUS OF A PROJECT.
Page 1

