APPENDIX F NOTA 22: PECAHAN KERJA RENOVASI BANGUNAN
KERJA-KERJA RENOVASI BAGI TAHUN 2018
Pelbaga
Ringkasn Kerja Cat Bahan Letrik Paip Buruh Total
i
Phase 1: Membina Bumbung & Memasang - 9,530 - - - 4,780 14,310
Tiles Lantai Wuduk Lelaki
Phase 2: Melebar Tangga Berbumbung & - 25,381 1,435 - - 14,064 40,880
Membina Walkway Berbumbung
Phase 3: Melebar Tempat Qurban - 2,974 - 38 157 4,060 7,229
Termasuk Palang Gantung Daging
Phase 4: Membina Stor Tetap 239 12,294 400 661 1,384 8,532 23,510
Penyimpanan Asset Surau
Phase 5: Membina Bilik Jenazah Baru 216 11,297 1,238 318 2,044 17,163 32,274
455 61,476 3,073 1,017 3,585 48,599 118,203
Pecahan Kos 1 2 3 4 5 Total
BAHAN MENGECAT
Aluminium Extension Pole - - - - 50
Brush - - - 11 7
Maxi Plus White - - - - 128
Maxilite Plus Paint 18L - - - 228 -
Roller Refill - - - - 13
Undercoat White Colourland - - - - 18
- - - 239 216 455
BAHAN KERJA-KERJA PEMBINAAN
Barangan-(Simen, Besi, Tiles, Batu, Konkrit) - 8,000 - - -
Batu Aggregate - - 225 75 75
Batu Simen - - 125 864 504
Besi BRC A7 CQ & A9 CQ - - 400 50 -
Besi-(Bumbung, Railing, Pagar, Palang, Tiang) - 17,381 - - -
Besi CQ R 6 MM - - - - 231
Besi CQ R6mm, Y10 & Y12 - - - 132 -
Besi Frame Tingkap - - - 1,008 -
Besi Palang Qurban - - 490 - -
Besi Palang, Tiang, Bumbung dll 8,400 - - - -
Besi Palang, Tiang, Tangki Air dll 2,600
Besi Rack Store c/w Plywood - - - 4,700 -
C Channel - - - - 146
Cement - - 615 558 822
Cement Gum - - - - 130
Cement White - - - - 22
Facing Brick - - - - 336
Industry Roofing - - - - 270
Kapur Air - - 9 105 30
Kayu 1 x 2 x 8 - - - 80 -
Kayu 5' & Papan - - - - 154
Longkang Tanah 9 inci - - 110 - -
Papan 1 x 8 x 10 - - - 504 -
Pasir Halus - - 160 640 480
Pasir Kasar - - 840 450 150
Pintu Sliding 82" x 96" - - - 1,176
Plaster Ceiling - - - 448 -
Plywood 12mm - - - 55 -
Roofing Industrial G30 Hijau - - - 1,032 -
Simen Putih - - - 2 -