Page 60 - BUKU LAPORAN MESYUARAT AGUNG TAHUNAN KALI KE5 v8
P. 60

APPENDIX F NOTA 22: PECAHAN KERJA RENOVASI BANGUNAN

               KERJA-KERJA RENOVASI BAGI TAHUN 2018
                                                                            Pelbaga
               Ringkasn Kerja                      Cat    Bahan    Letrik            Paip    Buruh   Total
                                                                            i
                Phase 1: Membina Bumbung & Memasang    -    9,530        -        -       -   4,780    14,310
               Tiles Lantai Wuduk Lelaki
                Phase 2: Melebar Tangga Berbumbung &   -   25,381    1,435        -       -   14,064   40,880
               Membina Walkway Berbumbung
                Phase 3: Melebar Tempat Qurban         -    2,974        -       38     157   4,060    7,229
               Termasuk Palang Gantung Daging
                Phase 4: Membina Stor Tetap          239   12,294      400      661   1,384   8,532    23,510
               Penyimpanan Asset Surau
                Phase 5: Membina Bilik Jenazah Baru    216   11,297   1,238     318   2,044   17,163   32,274
                                                     455   61,476    3,073    1,017   3,585   48,599   118,203



               Pecahan Kos                                   1        2        3       4       5      Total
               BAHAN MENGECAT
               Aluminium Extension Pole                         -        -        -       -      50
               Brush                                            -        -        -      11       7
               Maxi Plus White                                  -        -        -       -     128
               Maxilite Plus Paint 18L                          -        -        -     228       -
               Roller Refill                                    -        -        -       -      13
               Undercoat White Colourland                       -        -        -       -      18
                                                                -        -        -     239     216      455
               BAHAN KERJA-KERJA PEMBINAAN
               Barangan-(Simen, Besi, Tiles, Batu, Konkrit)     -    8,000        -       -       -
               Batu Aggregate                                   -        -      225      75      75
               Batu Simen                                       -        -      125     864     504
               Besi BRC A7 CQ & A9 CQ                           -        -      400      50       -
               Besi-(Bumbung, Railing, Pagar, Palang, Tiang)    -   17,381        -       -       -
               Besi CQ R 6 MM                                   -        -        -       -     231
               Besi CQ R6mm, Y10 & Y12                          -        -        -     132       -
               Besi Frame Tingkap                               -        -        -   1,008       -
               Besi Palang Qurban                               -        -      490       -       -
               Besi Palang, Tiang, Bumbung dll              8,400        -        -       -       -
               Besi Palang, Tiang, Tangki Air dll                                             2,600
               Besi Rack Store c/w Plywood                      -        -        -   4,700       -
               C Channel                                        -        -        -       -     146
               Cement                                           -        -      615     558     822
               Cement Gum                                       -        -        -       -     130
               Cement White                                     -        -        -       -      22
               Facing Brick                                     -        -        -       -     336
               Industry Roofing                                 -        -        -       -     270
               Kapur Air                                        -        -        9     105      30
               Kayu 1 x 2 x 8                                   -        -        -      80       -
               Kayu 5' & Papan                                  -        -        -       -     154
               Longkang Tanah 9 inci                            -        -      110       -       -
               Papan 1 x 8 x 10                                 -        -        -     504       -
               Pasir Halus                                      -        -      160     640     480
               Pasir Kasar                                      -        -      840     450     150
               Pintu Sliding 82" x 96"                          -        -        -           1,176
               Plaster Ceiling                                  -        -        -     448       -
               Plywood 12mm                                     -        -        -      55       -
               Roofing Industrial G30 Hijau                     -        -        -   1,032       -
               Simen Putih                                      -        -        -       2       -


                                                                                                      Page | 59
   55   56   57   58   59   60   61   62   63   64   65