Page 21 - Clearwater Christian College 1991
P. 21
ges happened.
he college has renovated
-Jeff Ekback
existing buildings and
The chapel was
constructed new ones to
really beautiful.
create more room for the
-Elizabeth McClenahan
increased student body. It’s good that all the
We saw much activity on were added to the south end
campus during the summer of Dambach Hall. Each of
of 1990 as a result of two these wings contains five
major construction projects new faculty offices and one
being completed in Dambach new classroom capable of
Hall and in Cathcart Hall. seating ninety students. Five
Projected increased student new classrooms were created
population required in the existing structure. The
expansion of the classroom computer lab was doubled in
and faculty office areas and size, and the typing lab was
consolidation of relocated to more suitable
administrative offices. quarters. The chapel,
The classrooms on the renamed the Gospel Center
second floor of Cathcart Hall Memorial Chapel, was
were renovated to become completely redesigned and
offices for the Dean of expanded to provide seating
Education, Admissions, for 525.
Financial Aid, and related Four music practice rooms
offices that were originally in were added on the west side
Dambach Hall. New offices of the building to provide
were installed for the Dean needed practice space. All
of Men, and Dean of primary classrooms are now
Women, Accounts Payable located in Dambach Hall, as
and Receivable, and for the well as most of the faculty
Executive Vice President, his offices. The Bookstore was
secretary, and the Director of relocated to new facilities in
Stewardship. the foyer of the Gymnasium.
The complete interior of The construction,
Dambach Hall was gutted remodeling, and redecorating
and the interior completely has enhanced the appearance
redesigned. Two new wings and comfort of the campus.
Construction 17