Page 38 - pd277-Nov19-mag-final-web_Neat
P. 38

NICKEL CONFERENCE REVIEW





       Exploration bright after Kambalda




          fter several years when its ongoing   turn with new managing director Da-  body, which has emerged as the central
       Aparticipation looked in doubt, Mincor   vid Southam re-establishing the com-  pillar of the company’s mining plans.
       Resources NL returned to the opening   pany’s mining credentials amid a resur-  The  development  of  Cassini  is  proof
       session of the Australian Nickel Confer-  gent nickel sector. In May, the company   there is still life left in the 50-year Kam-
       ence  with  a  message  of  production  re-  picked up the Long nickel mine from IGO   balda nickel field. And, the purchase of
       bounds and exploration opportunities.  and in August upgraded the new Cassini   Long gives Mincor the most dominant
         For many years Mincor was part of the   deposit resource to 985,000t @ 3.8% for   ground position in the district since WMC
       Australian junior nickel quartet alongside   37,800t nickel.            walked away two decades ago.
       Independence Group NL (IGO), Western   The company is now preparing to re-  Mincor and IGO were the major ben-
       Areas Ltd and Panoramic Resources   lease a DFS on a Kambalda restart by   eficiaries  of  WMC’s  departure  but  the
                                                      the  end  of  the  calendar   split ground meant Kambalda was never
                                                      year.                    again subjected to a unified exploration
                                                        Southam, who left fellow   push.
                                                      nickel producer Western    “The two companies never found a
                                                      Areas to take up the Mincor   way to work together on exploration but
                                                      role, said the company had   the Long acquisition allows us to operate
                                                      momentum on its side.    the entire complex,” Southam said.
                                                        “We are in the right com-  Mincor is eager to test targets which
                                                      modity at the right time,”   fell on the former IGO/Mincor boundary
                                                      he  said,  pointing  to  falling   and  already  has  two  underground  rigs
                                                      nickel  stocks  on  the  LME   turning at  the Spanner  prospect. The
                                                      and SHFE and increasing   company is also drilling under the Durkin
                                                      demand from both  stain-  orebody.
                                                      less steel and EV markets.   “There has only been $20 million spent
                                                        The   company    has   on greenfields exploration in the last 20
                                                      tapped  into  the  diversified   years;  that’s  criminal.  We  have  a  num-
                                                      demand, signing a new    ber of geological theories we want to test
                                                      offtake agreement with   and we think we can link up the entire
                                                      BHP Nickel West to send   system at depth.”
                                                      ore  to  the  Kambalda  con-  Drilling is ongoing at Cassini with the
                                                      centrator.               August resource upgrade being followed
                                                        “I  can  say  the  terms  of   by  hits  of  15.4m  @  4.7%  and  6.3m  @
                                                      the offtake are modern   7.1% nickel in September. Southam said
                                                      and we are pleased with   the exploration team planned to move
                                                      the  commitment   BHP    back  to  the  initial  Cassini  discovery
                                                      Nickel West has shown,”   holes which were never followed up for
                                        David Southam  Southam said, suggesting   resource definition.
                                                      contract  payabilities  were   “We have also conducted moving loop
       Ltd. However, as the nickel price began   higher than in previous agreements.   EM recently and yesterday we started
       its  slide  the  company  was  forced,  like   Mincor is cashed up with $29 million   RC drilling on the Juno 4 target which is
       Panoramic, to batten down the hatches,   in the bank, meaning it can start early   a Cassini lookalike,” he said.
       closing its Kambalda operations and re-  works on the Kambalda restart in 2020.   “Kambalda has proven exploration up-
       inventing itself as a gold explorer.  Those works will focus on box-cut and   side still.”
         This  year  has  seen  a  180  degree   decline development to the Cassini ore-





                                             The conference proceedings of the 2019
                                                     Australian Nickel Conference

                                                                   is available



                                                                 $60 (inc.GST)
          15 October 2019
           Perth, Western Australia        Phone (+61) 8 9321 0355 or email christine@paydirt.com.au






       Page 38   NOVeMBeR 2019   aUSTRaLIa’S PaYDIRT
   33   34   35   36   37   38   39   40   41   42   43