Page 67 - pd309-Oct22-mag-web-Neat
P. 67

Big plans for Bengwenyama





            outhern Palladium Ltd has begun   source from the company’s 134-201mt ex-  many of the main barriers to entry had
         Sdrilling its expansive exploration foot-  ploration target will form the basis of Phase   been lowered.
         print in South Africa’s Bushveld Complex   2.                              “If  you  look  at  downstream  beneficia-
         which managing director Johan Odendaal   Speaking  at  Africa  Down  Under,   tion, the hurdles to entry for the platinum
         unashamedly compares in size to the   Odendaal  illustrated  the  extent  of  South-  industry is high and we’ve got it all in South
         Kalgoorlie Super Pit.                ern Palladium’s property in the Bushveld   Africa, it’s not that we have to go a long dis-
           Phase 1 drilling at the Bengwenyama   Complex, comparing it to Australia’s most   tance to get out our product smelted and
         project kicked off in August after the com-  famous gold mine.           refined,” he said.
         pany listed on both the ASX and JSE in the   “Our exploration footprint is the same   “Currently, all the concentrate from the
         preceding months. Up to 25,000m will be   size  as  the  Kalgoorlie  Super  Pit,  which   Eastern  Limb  goes  to  the  Western  Limb
         completed over the next 10-12 months, fo-  gives you an idea of the size of this ore-  smelters near Rustenburg and that can get
         cused mainly on converting the existing 19   body,” he said.             refined  in  Johannesburg,  although  there
         moz inferred resource to indicated status.  “What’s  so  unique  about  the Bushveld   are also some refiners in Rustenburg.”
           Further drilling to deliver an inferred re-  Complex and these orebodies is that it’s a   Odendaal also highlighted the strong
                                              tabular orebody. It runs consistently from   relationship his company shares with the
                                              the east to the west. It’s not that we have   Bengwenyama community which holds a
                                              to go and find platinum, we know it’s there,   9.3% share in Southern Palladium via Nuri-
                                              we just have to go and firm it up.  nox Investments Pty Ltd, as well as 30%
                                               “If you want to be in platinum, South Af-  of prospecting right holder Miracle Upon
                                              rica is still the place to be.”     Miracle (MUM) Pty Ltd.
                                               Three  drill  rigs  were  turning  at  Beng-  “If we can develop this project in a safe
                                              wenyama last month, with another two rigs   and healthy environment, it will all benefit
                                              expected on site in due course to fast-track   us,” he said. “The community is an impor-
                                              exploration.                        tant partner, not just a BEE partner but a
                                               While Southern Palladium is some years   very important partner in this project.”
                                              away from starting production, Odendaal           – Michael Washbourne
                                              said the availability of third-party smelting
                                              facilities in the Bushveld Complex meant
                             Johan Odendaal


                        Chesser moves into place




          t’s all eyes on the Karakara target at   August included 1m @ 12.1 g/t gold from   “We  think  this  will  deliver  significantly
        IChesser Resources Ltd’s Diamba Sud   80m, 14m @ 2 g/t from 114m, and 11.45m   to our resource inventory but should also
         gold project in Senegal as the company   @ 7.2 g/t gold from 84.55m.     have a lower strip ratio than the Area A pit
         looks to hurdle the 1 moz goal line with an   “We’ve got all the final results now, we   and probably a slightly higher grade than
         upgraded resource estimate.          can start the resource estimation on this,”   what we’re seeing in the resource, so it
           “We’re  growing the  resource and put-  Grove said. “We’ve defined mineralisation   should uplift that value we see in a future
         ting ourselves into position to build the next   over 250m, these high-grade zones in the   mine development.”
         mine in Senegal,” Chesser managing di-  area seem to be about 200-300m long.  Across  the  border  in  Mali  are  Bar-
         rector Andrew Grove said at Africa Down                                  rick Gold Corp’s Loulo mine (12.5 moz)
         Under. “We’ve got a baseline of resources,                               and Gounkoto mine (5.5 moz), as well as
         importantly, we believe that’s going to grow                             B2Gold Corp’s Fekola mine.
         to beyond 1 moz this year.                                                 Drill success at Diamba Sud has so far
           “The development metrics, as proven by                                 capitalised  on  near-surface  mineralisa-
         our scoping study, show a very high-value,                               tion and Grove is curious to test further at
         technically simple, robust project. The val-                             depth.
         ue is going to improve significantly as we                                 “What we’ve done [at Diamba Sud] is
         add more ounces and we’re on the road to                                 find  the  near-surface  mineralisation  as
         an investment decision.”                                                 indicated by the geochemistry,” he ex-
           The March scoping study at Diamba                                      plained. “What we haven’t done, and what
         Sud outlined a 7.5-year mine life, post-tax                              Barrick haven’t done to the east of us, is
         NPV of $US301 million and IRR of 59%                                     understand the system well enough to
         with AISC of $US820/oz. The study was                                    target effectively repeats at depth. There
         based on the November maiden resource                                    must be mineralisation at depth.”
         of 781,000oz @ 1.6 g/t gold.                                               Diamba Sud’s FID is expected by mid-
           An estimate at Karakara is expected by                                 2024.
         the end of this year to join the Area A and
         Area D deposits and bring Diamba Sud to                                                    – Fraser Palamara
         1 moz gold.
           Drill results from Karakara at the end of
                                                                   Andrew Grove

                                                                                  aUSTRaLIa’S PaYDIRT   OCTOBeR 2022    Page 67
   62   63   64   65   66   67   68   69   70   71   72