Page 234 - ANC22-Presentations-Weds
P. 234

Widgie’s Value Proposition - An Optimal Location, History & Timeline



        Tier one jurisdiction and infrastructure support focus on returning Mt Edwards to production



                                                                             Expe rienced and
                 Proximal to critical                           Set to be production-ready                                                 Set to be production-ready at Mt
                                                                           dedicated team with
                                                                                  relevant
            infrastructure (roads, rail,                      at Mt Edwards by the end of                                                    Edwards by the end of 2023,
                                                                          nickelexploration and
           power and water). Located                            2023, coinciding optimally                                                 coinciding optimally with a global
                                                                         production track record.
            30km west of Kambalda,                                with a widely predicted                                                nickel supply shortfall projected  by
                                                                                                                                             Rystad Energy in 2023/2024.
           home to the nearest Nickel                         global nickel supply shortfall
               Concentrator (BHP).                                         in 2024/25.











           Project being developed by                           Proven production history
                an experienced and                                across four mines, with

         dedicated team with relevant                              significant value to be
              nickel exploration and                           leveraged from the project’s

             production track record.                                historical database.










                                                                                                                                                                                           4  4
   229   230   231   232   233   234   235   236   237   238   239