Page 55 - gmj138-Jan-Mar-20-mag-web_Neat
P. 55

Dacian has potentially identified a new production source at Mt Morgans






















          A total of 15 holes were completed at Mako with results including   0.5 g/t silver from 10m-32m, 54m @ 0.81 g/t gold and 0.63 g/t
          6m @ 14.9 g/t gold from 224.7m, 6m @ 11.7 g/t from 224.7m,   silver from 56-110m, 2m @ 3.09 g/t gold and 0.77 g/t silver from
          10.5m @ 5.4 g/t from 229.7m, 6m @ 8.3 g/t from 58.2m, 27m   222-224m, 2m @ 6.44 g/t gold and 87.4 g/t silver from 324-326m
          @ 3.6 g/t from 29.7m, 8.5m @ 11.7 g/t from 74.7m, 15m at 4.1g/t   and 8m @ 2.82 g/t gold and 29.96 g/t silver from 342m-350m.
          from 10.5m and 25.5m @ 3.16 g/t from 171m.           More assays were pending at the time of print.
          “The drilling results indicate strong potential to increase open pit
          gold inventory at Mako which will extend the life of our new high   PhoENix fliEs for daCiaN
          quality, low cost operation,” Resolute managing director John
          Welborn said.                                        Dacian  Gold  Ltd  has  potentially  identified  a  new  production
                                                               source  at  Mt  Morgans  with  infill  drilling  at  Phoenix  Ridge
                                                               delivering outstanding results, including 23.1m @ 30.2 g/t gold.
          ColombiaN gold for mEtmiNCo
                                                               Drilling has defined a new 350m parallel lode with potential to
          Metminco  Ltd,  soon  to  be  renamed  Los  Cerros  Ltd,  has   grow the maiden resource of 125,000oz @ 8.1 g/t gold. Infill
          intersected  a  350m-wide  zone  of  gold  mineralisation  from   drilling was ongoing at the time of print, with a resource update
          surface in the first diamond hole ever drilled into the Chuscal   scheduled for the March quarter.
          gold target in the Mid Cauca porphyry belt of Colombia, part of
                                                               Some  of  the  highlights  from  40m  x  40m  infill  drilling  within
          the company’s Quinchia gold project.
                                                               the inferred resource at the Phoenix Ridge deposit confirms
          Highlights  from  the  first  hole  of  maiden  Chuscal  drilling   continuity of high-grade gold mineralisation with results of 23.1m
          programme ended at 452m depth, with CHDDH001 passing   @ 30.2 g/t gold from 266.9m, 19.1m @ 5.1 g/t from 223.6m,
          through an extensive 350m-wide mineralised zone from surface   2.4m @ 47.5 g/t from 313.35m and 10.2m @ 3.0g/t from 235.6m.
          carrying  an  average  uncut  grade  of  0.57  g/t  gold  over  this
                                                               The new parallel high-grade shoot, less than 50m away from
          extensive interval.
                                                               the existing resource at Phoenix Ridge, has been defined over
          A number of intervals with higher grade gold and silver were   a 350m plunge-extent and remains open at depth. Highlights
          intersected within the broader 350m zone, including 6m @ 2.52   include 2.95m @ 17.7 g/t gold from 300.9m, 7.75m @ 8.3 g/t
          g/t gold and 10.25 g/t silver from 0m-6m (including 2m @ 5.56   from 202.2m, 4.35m @ 4.8 g/t from 166.6m, 1.4m @ 9 g/t from
          g/t gold and 29 g/t silver from surface), 22m @ 1.22g/t gold and   218.5m, 1.6m @ 6.2 g/t from 308.55m.




         Mining Support          Rig Support             Aerial Spraying         Charter













            PO Box 1163, Newman WA 6753, 0427 228 262, weldon@fortescuehelicopters.com.au




                                                         Page 55
   50   51   52   53   54   55   56   57   58   59   60