Page 24 - pd292-Apr21-mag-web
P. 24

coVer




       extend the high-grade                                                                   Hibernian  deposit
       zone. Recent intersec-                                                                  which has previously
       tions include 13m @ 2.1                                                                 returned intercepts of
       g/t gold and 44m @ 1                                                                    14m @ 71.7 g/t gold,
       g/t down plunge of the                                                                  34m @ 14.8 g/t, 8m
       life-of-mine pit design.                                                                @ 11.4 g/t and 2m @
        Hay is also optimistic                                                                 147 g/t.
       about near-term pro-                                                                      Hay ruled out the
       duction opportunities at                                                                possibility  of  Glen-
       the Sly Fox and Plym-                                                                   burgh and Mt Egerton
       outh satellite deposits,                                                                being considered as
       both within 1.5km of the                                                                potential satellite re-
       processing plant. Plym-                                                                 sources for Dalgaran-
       outh  is  expected  to  be                                                              ga due to the tyranny
       developed into an open                                                                  of distance, but he be-
       pit in the not-too-distant                                                              lieves Gascoyne has
       future, while Sly Fox is                                                                the capacity to deliver
       shaping as a potential                                                                  a second processing
       underground source.                                                                     centre when the time
        While it is not on his                                                                 is right.
       immediate agenda, Hay                                                                     “It needs to be a
       believes the various                                                                    standalone  operation
       pieces of the puzzle are                                                                in its own right and
       all coming together for                             Dalgaranga processing manager Lerisia Smit  could become a sec-
       Dalgaranga to become                                                                    ond production hub
       a potential processing                                                                  for us,” Hay said.
       hub for stranded assets in the district.  alous zone has already been delineated   “We need to do an exploration pro-
        “We’re strategically and fortunately   on the Tanqueray structure.      gramme  and  a  resource  definition  pro-
       placed to the west of Mt Magnet and   Briefly swapping his manager’s hat for   gramme,  both  at  Glenburgh  and  at  Mt
       we’re the only plant near to a number of   the geologist’s cap he wore at the start of   Egerton, to build the resource estimate up
       smaller mineral resources that could po-  his long career in the mining game, Hay   to circa 700,000oz from the 500,000oz we
       tentially be fed into Dalgaranga…but our   said it was particularly pleasing for Gas-  currently have to give us that opportunity
       No.1 focus remains organic growth,” Hay   coyne to now be in a position where it can   to look at feasibility studies for future de-
       said.                               tip  funds  towards  exploration  after  years   velopment.
        “We have 1,000sq km of exploration   having to prioritise operational patch-ups   “There is an opportunity up there for us
       tenure  around  Dalga-                              over the drill bit.  to look at other resources around the re-
       ranga, that’s our No.1                                “We have a fan-    gion for a ‘hub and spoke’, very similar to
       focus at the moment                                 tastic  growth  pipe-  what Ramelius [Resources Ltd] does, but
       and it’s why we’ve            It’s about            line  in  front of  us   at the moment our focus is on Glenburgh
       doubled our explora- “        seeing where          that previously was   and Mt Egerton.”
       tion budget [to $6.3                                just starved of cash,”   Gascoyne also owns the Mumbakine
       million]  for  this  finan-  the opportunities      Hay said. “We’re now   Well tenement adjacent to Capricorn Met-
       cial year.”               are and giving            generating operating   als  Ltd’s  upcoming  mine  at  Karlawinda.
        Gascoyne is on track                               free cash flow which,   The company has previously noted simi-
       to put down about       those people the            as a board, we’re    larities  in  the  geological  settings  on  its
       70,000m of drilling into                            very keen to reinvest   ground to those observed in the 2.1 moz
       its  various  properties   chance to develop        to develop and grow   Bibra deposit currently being developed by
       in FY2021, including   with a mentor who            the organisation.”   its neighbour.
       some 25,000m at Dal-                                  Gascoyne    has     It is not beyond the realms of possibility
       garanga alone across   can assist with that         more than 30 tar-    that Gascoyne could soon join the exclu-
       the March and June      understanding of            gets  in  its  portfolio   sive 100,000 ozpa gold producer’s club.
       quarters.                                           which are screaming   As Hay stressed, the current 80,000 ozpa
        Tanqueray,  about     what leadership is           to be drilled, accord-  output at Dalgaranga is the “absolute base
       2km from the process-        all about.             ing  to  Hay,  including   case” and opportunities to boost that pro-
       ing plant, continues to                             the Glenburgh and    duction capacity are under investigation.
       emerge as the lead                                  Mt Egerton regional   “Our  production  profile  at  the  moment
       greenfields   explora-                              exploration projects,   looks at the next four years and, impor-
       tion prospect following a recent intersec-  about 300km north of Dalgaranga.  tantly, that is without drilling another hole to
       tion of 9m @ 7 g/t gold (including 3m @   Glenburgh hosts a resource of 16.3mt   extend mine life or, ideally, finding a high-
       15.8 g/t) which is just 300m west of a bo-  @ 1 g/t for 510,000oz and sits on a granted   grade source,” Hay said.
       nanza hit of 8m @ 373.5 g/t previously   mining lease. Drill rigs are due on site this   “That gives us enough time to explore or
       drilled in 2018.                    month for both exploration and resource   look at other opportunities, possibly M&A,
        Follow-up drilling was under way at the   definition programmes.        in the region to bring in higher grade ma-
       time of print to test the Tanqueray trend   Mt Egerton, about 180km north-east of   terial which will then give us the chance
       beyond a 150m depth. A 5km long anom-  Glenburgh, also contains the high-grade   to press towards that 100,000 ozpa mark



       Page 24   aPRIL 2021    aUSTRaLIa’S PaYDIRT
   19   20   21   22   23   24   25   26   27   28   29