Page 70 - pd280-Mar20-mag-web_Neat
P. 70

sAReIc PReVIeW





                Poochera positioned for 2021




          PFS on the Poochera halloysite-kaolin JV is on track for com-
       A  pletion in Q2, with production from the Carey’s Well deposit
       potentially online mid next year.
        “Our project is a lot different from others because of the short
       timeline to production we are trying to achieve, 1.5 years com-
       pared to a gold project which is about 10 years,” Andromeda man-
       aging director James Marsh told Paydirt.
        A 2019 scoping study on Carey’s Well indicated an initial pre-
       production capex of $9 million would be required to kick-start a
       DSO operation with material from shallow open pit mining sent to
       China or Japan for toll wet refining.
        However, studies are underway to determine if a wet process-
       ing plant at Poochera is a viable option for the Andromeda/Mi-
       notaur Exploration Ltd JV to pursue with results expected to be
       known during the March quarter.
        The scoping study estimated $28 million for installation of a dry
       plant at site during the second year of operations, a figure slated
       to be funded via cashflow.
        Halloysite-kaolin demand is driven by mature markets in ce-
       ramics and catalysts (for fluid catalytic cracking), while new and
       emerging markets include HPA production and halloysite nano-
       tube technologies.
        “There happens to be a world shortage of halloysite-kaolin
       material and we have a chance to fill that gap. Kaolin has been
       used for 2,000 years and there is strong demand for that, but we   Andromeda was close to securing 51% of the Poochera JV project
       also  have  the  halloysite  where  there  is  huge  interest  in  hi-tech   at the time of print. The company will move to 75% ownership once
                                                                                           triggering a decision to mine















            TOTAL QUALITY ASSURANCE
            ACROSS THE RESOURCES                        C
            SUPPLY CHAIN                                M
            Intertek’s network of minerals laboratories offers,   Y
            world-class geochemical assay and testing
            services, including:                        CM
            •  Sample preparation                       MY
            •  Fire assay & precious metal analysis                 Vanta    Portable XRF
            •  Exploration geochemistry                 CY
            •  Environmental testing                   CMY
            •  Mine-site laboratories                            for the Minerals Industry
            •  Coal inspection & testing                K
            •  Robotics & automated laboratory systems
            •  Trade and inspection services
                                                              Unparalleled analytical performance and speed
                                                              Drop tested and IP65 rated
              FOR MORE INFORMATION
                                                              GPS,WI-FI, and cloud enabled
               +61 8 9263 0100
               min.aus.per@intertek.com

               intertek.com






       Page 70   MaRCH 2020   aUSTRaLIa’S PaYDIRT
   65   66   67   68   69   70   71   72   73   74   75