Page 208 - NEWGEN21-Proceedings-Full
P. 208
Thursday’s Gossan – Our Early Exploration
First pass drilling
● All 3 initial drill holes intercepted phyllic
alteration at expected depths.
● The plan was to drill through this into the
potassic zone.
● Hit a low-angle structure instead.
● Below the low-angle structure the alteration
was a more distal propylitic assemblage.
29

