Page 208 - NEWGEN21-Proceedings-Full
P. 208

Thursday’s Gossan – Our Early Exploration







       First pass drilling



       ● All 3 initial drill holes intercepted phyllic

           alteration at expected depths.


       ● The plan was to drill through this into the

           potassic zone.


       ● Hit a low-angle structure instead.


       ● Below the low-angle structure the alteration

           was a more distal propylitic assemblage.



























                                                                                                                                                                                            29
   203   204   205   206   207   208   209   210   211   212   213