Page 311 - NEWGEN21-Proceedings-Full
P. 311

Mt Berghaus West AC program





         ▪ During 2018-19 - 48.6km of AC drilling at various prospects



         ▪ To end 2019 - 19.7km AC at Mt Berghaus West



         ▪ Drill fences over Hemi were spaced at 640m, with holes 160m apart




                                                                                                                       Mt Berghaus (181Koz)
                                   5km




                           Proposed AC traverses








                                                                                                                                          Wingina (288Koz)











                     Calvert (52Koz)





                                                                                                                                                                                        22
   306   307   308   309   310   311   312   313   314   315   316