Mt Berghaus West AC program
▪ During 2018-19 - 48.6km of AC drilling at various prospects
▪ To end 2019 - 19.7km AC at Mt Berghaus West
▪ Drill fences over Hemi were spaced at 640m, with holes 160m apart
Mt Berghaus (181Koz)
5km
Proposed AC traverses
Wingina (288Koz)
Calvert (52Koz)
22