Page 403 - NEWGEN21-Proceedings-Full
P. 403
Throughput Study
• Pit Optimisations
• 6Mtpa to 12Mtpa
• Realistic Costs
• Mine schedules
• Financial Modelling
Block Model Key
August 2021 MIK blocks shown
sized based on the proportion of the
block above a 0.2g/t cut-off grade.
<0.20g/t
0.20 – 0.40g/t
0.40 – 0.75g/t
0.75 – 1.20g/t
>1.20g/t
TSXV MAU Montage Gold Corp.

