Page 537 - NEWGEN21-Proceedings-Full
P. 537

TSX: ME | OTC: MEAUF | Xetra: MOP



          Location & Access










                                                                               Tower gold project




                                                                               • Little to no outcrop
                                                                               • Variable overburden

                                                                               • Some wet areas, winter drilling only
                                                                                      • Packed winter snow roads

                                                                               • Strong winters (Down to -30°C)
                                                                               • Summer (Up to 30° C)

                                                                               • Annual precipitation: ~750mm
                                                                                      • Long winters, a lot of snow

                                                                               • Good road access
                                                                               • Adjacent to major highway
      Summer conditions (South West deposit area, Golden Highway)
                                                                               • ~1 hour drive to major mining centre
                                                                               • Cell phone coverage

                                                                                                                                     Winter conditions (Windjammer South deposit area)






                 monetagold.com                                                                                                                                                  27
   532   533   534   535   536   537   538   539   540   541   542