Page 552 - NEWGEN21-Proceedings-Full
P. 552
TSX: ME | OTC: MEAUF | Xetra: MOP
Conclusions
Tower Gold Project
• Most of the area is covered by overburden
• Precluded historical prospectors from locating mineralization
• What worked ?
• Magnetics defined structures and main rock units. Located BIF
• Basal till sampling located gold below till
• Defining mineralization paragenesis
• Stratigraphic column (geological interpretation)
• Defining structures
Timmins core facility
• Drilling and orientation of core
• Preserving core
• Consolidation of ground
• Revisiting core with re-interpretation
• Significant upside for resource expansion
• What did not work ?
• IP surveys, no major sulphide dissemination
• EM
• Locating alteration with magnetics
• No geological interpretation
Garrison core facility
monetagold.com 42

