Page 736 - NEWGEN21-Proceedings-Full
P. 736
Tchaga – upcoming Maiden Mineral Resource Estimate
Expanding mineralised
footprint with further drilling
Large portion of soil anomaly
remains to be drilled
3m @ 4.54g/t Au
23m @ 2.46g/t Au
Drilling along the NE-SW 32m @ 7.1g/t Au
oriented D2 structures
10m @ 18.98g/t Au
28m @ 4.86g/t Au 2km
Drilling along the fold axis and 41m @ 4.51g/t Au; and
preferential beds/contacts 15m @ 1.32g/t Au
9m @ 6.26g/t Au; and
4m @ 1.48g/t Au
Drilling potential western limb of fold Averages 36m @ 2.03g/t Au
(alluvial cover = poor soil response 2m @ 24.06g/t Au
Tchaga
Watercourse
South

