Page 412 - ANC-Presentations-Full-18-10_Neat
P. 412
Nepean Nickel Project
NEPEAN DEEPS TARGET: SIGNIFICANT NPDD008
DIAMOND DRILL PROGRAM
Diamond drill program underway: Nepean
UG mine
• First drillhole NPDD008 just EOH at 1291m depth Pegmatite
• Slower controlled drilling to ensure holes test target Ultramafic
areas, 6 weeks to complete 32m, Sill 1?
NPDD008 drilled as a stratigraphic hole to test for a
footwall contact below historic mine and as a platform
for downhole geophysics (DHEM and DHMMR) Pegmatite
First hole to successfully drill through lower pegmatite
intrusion and intersect a greenstone sequence from
993m-1291m (EOH), including ~46m total of Ultramafic 20m Ultramafics,
ultramafics from 1088.5 - 1108.5m, 1144.5 – 1148.35m Ultramafic 4m mafics, seds
and 1210.5 - 1233m Ultramafic 22.5m
Further drillholes to be planned based on geological Fault Fault
interpretation and results of DH geophysics
200m
Seismic reprocessing and interpretation
* Refer to ASX Announcement – AUROCH TO ACQUIRE HIGH-GRADE NEPEAN NICKEL PROJECT
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-02307223 6A1006606?access_token=83ff96335c2d45a094df02a206a39ff4
9 WWW.AUROCHMINERALS.COM

