Page 504 - ANC-Presentations-Full-18-10_Neat
P. 504
Nickel Sulphide Resource Drilling
▪ Multiple nickel sulphide
deposits with potential to
significantly extend along strike
and at depth
▪ Shallow mineralisation identified
to date is amenable to open pit
mining
▪ Existing drilling highlights
include:
– 4.13m at 2.15% Ni (RAV1)
– 2.56m at 7.86% Ni (RAV4W)
▪ Resource drilling to upgrade to
JORC 2012 at RAV1, RAV4 &
RAV4 West
▪ Walk-up high potential targets
identified at RAV5
▪ Drilling planned for Q4 CY21 15

