Page 53 - gmj142-Jan-Mar2-mag-web
P. 53

Pathfinder joins party in Argentina  Challenger on


                    the rise



           in Argentina





                         by Mark Andrews
                                                                          Half of the historic Hualilan resource was based on
                                                                                    underground sampling and mapping
             he GMJ Explorer of the Year honours list has always been
          Theavily populated by companies focused on elephant country
          in Western Australia and West Africa.                Hualilan is a high-grade gold project, with a historic skarn resource
                                                               of 627,000oz gold @ 13.7 g/t (assuming 10 g/t gold equivalent),
          The applecart was not toppled in 2020, with De Grey Mining Ltd
                                                               associated with an underlying porphyry gold system.
          receiving the honours for the Hemi discovery in WA’s Pilbara.
                                                               Challenger is earning up to 75% in Hualilan, with drilling to date
          Estimations  are  that  Hemi  could  host  3-5  moz  gold  and  De
                                                               by the company resulting in extended mineralisation in multiple
          Grey’s  maiden  resource  announcement  in  mid-2021  is  highly
                                                               directions and confirmed high grades including 6.1m @ 34.6 g/t
          anticipated.
                                                               gold, 21.9 g/t silver, 2.9% zinc; 6.7m @ 14.3 g/t gold, 140 g/t silver
          Hemi sits in a class of its own at the moment, however, the next
                                                               and 7.3% zinc.
          12  months  could  well  be  company-defining  for  the  emerging
                                                               The  company  has  had  five  rigs  drilling  at  Hualilan  since
          Challenger Exploration Ltd in Argentina and time will tell if both
                                                               September,  with  stratigraphic  drilling  targeting  the  intrusion-
          company and country become fancied propositions in the market.
                                                               hosted system in the Gap zone at Cerro Norte the focus of an
          In late 2020, WA and West African gold plays continued to be all
                                                               initial 10,000m programme.
          the rage on the ASX, however, the appetite for exploration in parts
                                                               The next 20,000m of drilling was planned to focus on extension/
          of Latin America appears to be returning.
                                                               infill work at the Magnata and Sanchez fault (two rigs) where high-
          Challenger is one of the companies leading the charge in the
                                                               grade assays have been produced by Challenger, while one rig
          region and was trading at 20c/share, with a market cap of $120
                                                               would be dedicated to extension/infill of manto mineralisation and
          million and about $20 million in cash (September 2020) to ramp-
                                                               two rigs will be churning away at the underlying intrusion-hosted
          up drilling at the high-grade Hualilan gold project in the Tier 1 San
                                                               gold discovery.
          Juan province, Argentina.
                                                               Meanwhile, Challenger hopes to push as many historical ounces
          “We’ll  be  drilling  out  our  first  resource  and  then  we’ll  have  a
                                                               into JORC resource as possible through a series of underground
          couple of resource upgrades going forward. By next year we’ll
                                                               mapping and sampling activities. Assays were expected to be
          hopefully  have  a  multi-million  ounce  deposit  in  Argentina.
                                                               available in the new year.
          We’re really beginning to get an understanding of how big it is,”
                                                               The  level  of  enthusiasm  for  gold  stories  is  expected  to  be
                                    Challenger managing director
                                                               sustained throughout 2021, however, Knauer senses a change of
                                    Kris  Knauer  told  GMJ  in
                                                               attitude from investors in the market.
                                    December.
                                                               “In the last month, the market has got a bit tricky and you now
                                    “We have a number of high-
                                                               have to have something. You can’t just be a gold company; you
                                    quality Argentinian geologists
                                                               have to have some meat on the bones of the story. I still don’t
                                    on  the  ground  and  we’ll
                                                               think the market understands what we have in Argentina and
                                    probably  end  up  drilling
                                                               where it will end up, but at least now we have some recognition
                                    double  the  45,000m  we’ve
                                                               for what we are building over there,” Knauer said.
                                    got  planned  by  the  time  we
                                    finish as every second hole is   “It is a lot bigger than we first thought and there are a lot more
                                    throwing up nice surprises at   styles of mineralisation; it is not just the traditional high-grade stuff
                                    the moment.”               in the skarn in the limestone. There is high-grade stuff between
                                                               the two main lodes, the high-grade stuff can be hosted basically
                                   Although Challenger has     anywhere you have open space. Then there is the size of this
                                   planned a 45,000m drilling   underlying intrusion-hosted [mineralisation] to be considered. We
                                   programme at Hualilan, the   have now pumped a couple of holes down past 500m because
                                   company could easily end up   they look like they are still pretty interesting mineralised rocks; it is
                                   doubling the metreage       a big system that hadn’t been looked at.”
                                                         Page 53
   48   49   50   51   52   53   54   55   56   57   58