Page 70 - gmj145-Oct-Dec-mag-web_Neat
P. 70

DRILL BITS                     Exploring together for success            bostech.com.au




          Kin ready to sprout with                              Boulder and Whistler. The resource update is expected before
          Mt Flora discovery                                    year’s end.
                                                                Assay  results  from  a  recently  completed  22,000m  aircore
          Kin Mining NL has reported what it believes is a significant new
                                                                programme which tested several early-stage targets proximal to
          discovery only 20km east of its main Cardinia gold project.
                                                                the existing resource areas are also imminent.
          Diamond drilling to test the primary zone beneath recent aircore
          results at Mt Flora has  intersected two zones of sulphide
          mineralisation. These zones are interpreted to be down-plunge   australasian’s encouraGinG start
          extensions to previously reported hits of 22m @ 8.96 g/t gold and   at May Queen
          8m @ 2.79 g/t gold.
                                                                Australasian  Gold  Ltd  has  confirmed  the  presence  of  high-
          Kin managing director Andrew Munckton said the company now
                                                                grade gold mineralisation from maiden drilling at its May Queen
          had “sufficient confidence” to suggest Mt Flora was a significant   gold project in Queensland.
          new gold discovery.
                                                                The programme, combined with some rock  chip sampling,
          “While assays are awaited for the diamond drill hole, visual
                                                                delivered encouraging initial results which indicated the potential
          inspection of the core shows that it has successfully intersected   for a gold-copper porphyry system within the project area.
          the interpreted down-plunge extension of two zones of high-grade
          mineralisation seen in aircore drilling,” he said. “This suggests
          that there is a significant primary gold system beneath the 700m
          long, near-surface eastern zone mineralisation. Further work is
          required to test beneath the 400m long north-western zone.”
          Newly reported results include 4m @ 1.01 g/t gold from 48m
          and 4m @ 1.02 g/t gold from 24m. In addition, the company has
          also completed a diamond hole beneath the high-grade results
          received from the eastern zone.
          RC and diamond drilling will resume in October, the company
          saying the programme would lay the foundations for a maiden   Australasian Gold has completed its maiden drilling campaign at
          resource estimate.                                                          the May Queen project, Queensland


          Gateway resuMes resource drillinG                     Surface rock chip sampling returned grades up to 2.66 g/t gold
                                                                and 3.43% copper, while diamond drilling revealed alteration
          at GidGee                                             assemblages  and  zonation  which  are  indicative  of  porphyry

          Gateway  Mining  Ltd  has  begun  a  new  4,000m  RC  drilling   alteration that will guide future exploration. Best hits included
          programme chasing northern extensions to  the Evermore   6m @ 1.99 g/t gold from 35m and 1m @ 9.39 g/t gold from 68m.
          discovery at Gidgee.                                  Australasian now plans to undertake additional geophysical
          The programme is also designed to infill about 350m of the   surveys,  including  an  IP  survey,  to  define  potential  silica-
          northern strike of the Achilles North prospect in order to extend   enriched areas with possible disseminated sulphides. Results
          the footprint ahead of the upcoming maiden resource estimate   will assist the company with a follow-up RC programme to be
          for the Murchison-based project.                      undertaken in the coming months.
          Drilling will be completed by mid-October with the results to   Meanwhile, the company has started exploration activities at its
          feed into the current resource estimation being undertaken for   Mt Peake lithium project in the Northern Territory where it sees
          five key deposits at Gidgee, including updates for Montague-  potential for a significant discovery in a known pegmatite field.

















         Exploring together for success





                                                         Page 70
   65   66   67   68   69   70   71   72   73   74   75