Page 16 - pd284-July20-mag-web_Neat
P. 16

neWs





                    Weird and



           wonderful times




                    at Chalice





          o one missed Chalice Gold Mines Ltd’s   g/t palladium, 1 g/t platinum,
      Nannouncement in March of its nickel   1.3% nickel, 0.6% copper,
       sulphide discovery at Julimar, 70km north-  0.07% cobalt from 191.4m in
       east of Perth.                      JD003.
        The first drill hole – 19m @ 2.59% nick-  “I’ve been surprised about
       el, 1.04% copper, 8.37g/t palladium and   our performance in the last
       1.11g/t  platinum  from  48m  in  fresh  rock,   week, the [June 15] results
       included a massive sulphide zone of 13m   were good, but got lost in a                          Alex Dorsch
       @ 3.15% nickel, 1.19% copper, 8.85 g/t   sea of other opportunities
       palladium and 1.09 g/t platinum – was re-  plus talk globally about a second wave of   moment, we put out some results [on June                   REGISTER NOW!
       leased as the world was thrown into chaos   infections,” Dorsch told Paydirt.  15] which is demonstrating we have a nice
       by COVID-19.                          “It is kind of a two-speed speccy [sic]   continuous zone of high-grade mineralisa-
        Nevertheless,  the  significance  of  Juli-  end, those that have the impressive results   tion over about 200m strike and over 100m
       mar saw Chalice well supported by major   are raising money like they have never   of dip extent.
       institutional and sophisticated investors   been able to raise before and there’s eve-  “We know we have nice high-grade min-
       in a $30 million raising soon                                                      eralisation around 1-1.5%
       after for further RC and dia-                                                      nickel,  5-6  g/t  PGEs.  Our
       mond drilling at Julimar and                                                       confidence after seeing those
       the Pyramid Hill gold project                                                      results has gone up a notch.
       in Victoria.                        We think Julimar is the key                    In our view those results are
        There was no shortage     “         geological feature and nothing                really starting to demonstrate
       of interest in Chalice’s May                                                       that we have continuity and
       capital raising, with the com-  else surrounding us gets us too                    a  zone  there  that  is  really
       pany  reporting  applications   excited. I think well and truly we have            hanging together. That is es-
       totalling $75 million were re-                                                     sentially what we are doing
       ceived.                     a strong foothold on the province and                  now, we are continuing to
        After  settling  for  $30  mil-                                                   drill out that high-grade zone
       lion, the company has about   we’re not paying too much attention to               with a diamond rig and we
       $46 million to continue test-         what others are doing.                       have RC rigs doing a wider
       ing  the  full  extent  of  the                                                    spaced programme over the
       1.6km-long, 700m-wide min-                                                         entire  intrusive  body,  which
       eralised system at Julimar, as                                                     is 1.6km-long. We are scop-
       it looks to put together a potential maiden   ryone else without the speccy results that   ing out both styles of mineralisation at the
       resource and forge ahead with preliminary   are going further backwards. It is a funny   moment, as well as doing metallurgical
       metallurgical  testwork  and  initial  mining,   market and hard to pin down what is actu-  test work and going through the approvals
       processing, environmental and economic   ally happening.”                process.”
       scoping studies are also part of the plan.  Starting 2020 at 24c/share, Chalice had   Located in State Forest territory, Chalice
        In the meantime, a steady stream of   bolted to a high of $1.24c/share by May 20   is taking a measured approach to the ap-
       drilling results will continue to be released   and at the time of print was trading at 87c/  provals process at Julimar.
       with an update in mid-June particularly   share.                          “We are going to do that in a staged
       pleasing  Chalice  managing  director  Alex   The company’s success at Julimar has   manner to get into the State Forest area
       Dorsch.                             seen a rush of activity in surrounding areas   to do some non-ground disturbing recon-
        The extension of wide, high-grade PGE-  by companies claiming “nearology” plays,   naissance activities hopefully in the next
       nickel-copper  matrix zone  at  the  Julimar   however, Dorsch has no doubt Chalice   few months. Then we will go back for ap-
       Matrix sulphide G2 Zone, which has now   has the plum position.          proval to do some drilling,” Dorsch said.
       been intersected in six drill holes, was re-  “We think Julimar is the key geological   “It is not as straightforward as going out
       ported as another shot of geological con-  feature and nothing else surrounding us   and drilling a pastoral lease in the Eastern
       fidence “in the presence of a wide, con-  gets us too excited. I think well and truly   Goldfields, but we have to demonstrate we
       tinuous, open high-grade zone over about   we have a strong foothold on the province   are doing the right thing by the environ-
       200m strike length”.                and we’re not paying too much attention to   ment and we are responsible explorers.”             australiannickelconference.com
        A new high-grade PGE-nickel-copper   what others are doing,” he said.                 – Mark Andrews
       matrix sulphide intercept at the Gonneville   “We have three rigs on the project at the
       intrusive was highlighted by 17.6m @ 5.3                                                                                    To present, exhibit or attend as a delegate please contact Mitchelle Matambo
                                                                                                                                                on (+61) 8 9321 0355 or email mitchelle@paydirt.com.au
       Page 16   JULY 2020   aUSTRaLIa’S PaYDIRT
   11   12   13   14   15   16   17   18   19   20   21