Page 160 - ANC20-Proceedings-Presentations-Full
P. 160
Accelerated drilling and metallurgical testwork program underway – aiming
to define a maiden Mineral Resource by June 2021
2020 Jul Aug Sept Oct Nov Dec
Julimar Project, WA
Access Approvals Julimar State Forest CMP Stage 1
Julimar State Forest
Geophysics DHEM Airborne EM
Soil Sampling Julimar State Forest (access pending)
RC Drilling 200x80m over entire intrusion 80m step-out and 40x40m infill to ~250m deep (2 rigs)
Diamond Drilling 80m step-out and infill beyond 250m deep (2 rigs)
MRE / Metallurgy / Prelim Rougher Floatation Testwork Flotation testwork / optimisation
Mining Studies
17

