Page 611 - ANC20-Proceedings-Presentations-Full
P. 611

LEINSTER NICKEL PROJECT



      THE HORN

   • Historic JORC (2004) Resource*: nickel sulphide mineralisation
      remains open at depth and along strike
   • Numerous drill-hole intercepts of thick high-grade semi-
      massive to massive nickel sulphides; e.g:
           • 14.66m @ 2.19% Ni & 0.48% Cu from 132.6m

           • 10.80m @ 2.21% Ni & 0.53% Cu from 144.0m

           • 7.00m @ 2.58% Ni & 0.63% Cu from 158.6m
   • Planned 2000m Resource drilling DD & RC to commence this
      month, upgrading resource to JORC (2012)                                08BWDD0039































                                                                                                               Aeromagnetics:  RTP E shade non-linear


     8   WWW.AUROCHMINERALS.COM     * Refer to ASX Announcement 28 May 2019
   606   607   608   609   610   611   612   613   614   615   616