Page 611 - ANC20-Proceedings-Presentations-Full
P. 611
LEINSTER NICKEL PROJECT
THE HORN
• Historic JORC (2004) Resource*: nickel sulphide mineralisation
remains open at depth and along strike
• Numerous drill-hole intercepts of thick high-grade semi-
massive to massive nickel sulphides; e.g:
• 14.66m @ 2.19% Ni & 0.48% Cu from 132.6m
• 10.80m @ 2.21% Ni & 0.53% Cu from 144.0m
• 7.00m @ 2.58% Ni & 0.63% Cu from 158.6m
• Planned 2000m Resource drilling DD & RC to commence this
month, upgrading resource to JORC (2012) 08BWDD0039
Aeromagnetics: RTP E shade non-linear
8 WWW.AUROCHMINERALS.COM * Refer to ASX Announcement 28 May 2019

