Supporting your ambitious store growth strategy




                       Deliver 50 store vision by 2025




            Priority                   Phase 1: Drive profitable growth                    Phase 2: Accelerate growth                     Phase 3: Lead the market
                                       & build plan

            A. Agree model store       • Critical path activity developed with milestones  • Develop format and specification for larger  • Iterate model store to lead on customer
               blueprint & standards   • Set-up reporting tools                               sites and outside London                       service and experience
                                       • Chair PMO meetings                                • Develop cost plan and targets - value        • Develop concept stores and test formats
               Drive down cost per
               store                   • Set model store blueprint and specification          engineer                                       ahead of next stage of growth
                                       • Define and document store development end         • Develop database for existing stores         • Cost plan and target innovation and cost
                                          to end process                                                                                     reduction /sqft
                                       • Value engineer to target capex of £230/sqft /
                                          £575k (2500 sqft) target per store
                                       • Risk mitigation strategies
            B. Deliver store roll-out  • Set up supply chain (key: main contractor, M&E,  • Sequence and prioritise next 38 stores        • Deliver additional 20 stores @ £230/sqft –
                                          refrigeration, joinery)                          • Deliver at least 1 store outside London         3%
                                       • Resource delivery programme                       • Assemble flexible team for store delivery    • Assume majority outside London
                                                                                              PM/QS
                                                                                           • Plan for first 20 stores to be delivered

            C. Optimise existing       • Determine store specific action plans             • Develop delivery programme for small         • Continuous development and value
            stores                     • Prioritise capital works programme                   capital works e.g.energy save                  improvement



       SOLUTION  ARTELIA                                       Design                                            ARTELIA
             PROGRAMME
                                                                                                                 PROJECT
                                                                spec
             MANAGEMENT
                                                                                                                 DELIVERY
             OFFICE (PMO)
                                                                                                                 RESOURCE
   1   2   3   4   5   6   7   8   9   10   11