Page 71 - E24 Electrical Notebook
P. 71

LV Switchgear MNS Technical Data - 67

MNS Platform                                                                 Operational Safety & Availability

ABB is the worldwide leader in the production of low voltage switchgears     The MNS low voltage switchgear system has been subjected to extensive
with more than 1.5 million cubicles of the MNS system installed since the    type tests in compliance with global standards. In order to ensure the
introduction to the market of this technology in 1973. Due to strong         highest possible degree of safety, ABB continues to conduct tests as part
application of the modularity concept either for the mechanical or           of a continuous development program. These tests are based on the
electrical development, together with the use of unified components, it      most critical applications of the entire product or performance range. The
was possible to realise flexible and compact solutions at the same time.     results of these tests are applicable to the various low voltage switchgear
Over the years the MNS system has become a reference for this industrial     and control gear assemblies in accordance with IEC 61439-1 & 2; DIN
market with regard to safety, reliability and overall quality.               EN 60439-1 (VDE 0660 Part 500). In addition to these specifications,
ABB’s comprehensive know-how of the design and construction of low           ABB adopted as a standard IEC 61641 for testing under conditions of
voltage systems comes from its experiences in both local and global          arcing due to an internal fault. There are five criteria observed for the test
markets. This extraordinary knowledge, together with an extended             and in line with its ‘Safety Plus’ statement, ABB ensures that all five are
network for support and assistance all around the world, makes the MNS       met. In addition to these criteria, ABB also meets the additional plant
Platform the best choice.                                                    protection criteria as detailed in VDE 0660 Part 500.
The main characteristics of the MNS platform are flexibility, together with
the high technology content; due to this mix it is possible to satisfy the   Operating Procedures
majority of all customer requests. Optimisation of the configurations is
achieved using ABB’s advanced ACB and MCCB breakers with either              The company’s operating systems and procedures are fully certified to
fixed or withdrawable modules. Cables or bus duct entry can be from          ISO 9001 requirements, the stringent environmental standards of ISO
either the top or the bottom.                                                14001 and to OHSAS 18001 Health & Safety requirements.
Safety is one of the key points for the development of the MNS Platform
– indeed all MNS systems can be supplied in “Arc Proof Version” up to        After Sales, Service & Maintenance
100kA along with Seismic testing making the ABB MNS System suitable
for installation in critical, harsh and extreme conditions.                  Routine servicing and maintenance of LV installations by the company’s
                                                                             highly qualified engineers will ensure that equipment remains safe to
                                                                             operate – and will minimise the risk of unexpected breakdown and
                                                                             interruption of supply. Cost-effective packages, which are carefully tailored
                                                                             to clients’ individual needs, can cover an extensive range of requirements.

Standards & Testing                           IEC61439-1/-2, CEI 614391

 Standards                                    ABB SACE, ACAE LOVAG, SINAL, Cesi and Ismes
 Verification by testing *                    ASTA: Great Britain (resistant to accidental arcs according to IEC 61641 & IEC 60298, Appendix AA)
 Test Certificates                            DRL German Research Institute for Aerospace e.V., Jüllich, Earthquake Test for Security Areas in Nuclear Power Station
                                              IABG Industrieanlagen Betriebsgesellschaft, vibration and shock tests
                                              Complying with Germanischer Lloyd, Hamburg

Electrical Data                               1000V AC, 1500V DC **
                                              690V AC, 750V DC **
 Rated Voltages                               Up to 6 / 8 / 12kV **
 Rated insulation voltage Ui                  II / III / IV **
 Rated insulation voltage Ue                  3
 Rated impulse withstand voltage Uimp         50-60Hz
 Overvoltage category
 Degree of pollution                          Up to 8000 A
 Rated frequency                              Up to 264 kA
 Rated Currents                               Up to 120 kA
 Main busbars:
 Rated current Ie                             Up to 4000 A
 Rated peak withstand current lpk             Up to 264 kA
 Rated short-time withstand current lcw       Up to 120 kA
 Distribution bars:
 Rated current le                             Up to 100 kA 0.3s
 Rated peak withstand current lpk             Criteria 1 to 5 and 6 to 7
 Rated short-time withstand current lcw
                                              IP20
Arc Proof                                     IP30 standard up to IP54

 Test according to IEC 61641                  Internal for service
                                              min -5ºC, max 40ºC, average 24h 35ºC
Mechanical Characteristics                    max 50% at 40ºC
                                              –< 2000m
 Degrees of Protection (IEC 60529, EN 60529)
 With door open                               Up to 4b
 With door closed                             Up to 4b type 7
 Normal Conditions
 Installation                                 Sheathed busbars, treated busbars (Ag/Sn)
 Ambient temperature
 Relative humidity
 Height
 Form of Separation
 According IEC 61439-2
 According BS 61439-2

Options

 Busbar Systems
 Main and branch busbars

* Design verification by testing: where an assembly has previously been tested in accordance with IEC 60439-1 and the results fulfil the requirements of IEC 61439 1/-2, the verificatio\\\\\\\\\\\\n of these tests need not be repeated.
** Depending on the electrical equipment.

ABB Ltd                                    Tel : +44 (0) 191 514 4555
(Low Voltage Systems)                      Fax : +44 (0) 191 514 5505
Hanover Place
Sunderland                           Email : sales.lvs@gb.abb.com
SR4 6BY                     Website : www.abb.co.uk/lowvoltage