Page 27 - 21-03-23-Conceptual Master Plan to Share_Neat
P. 27
INSPIRATION:
TUCKER PLATEAU
ARCHITECT’S NOTES:
A. Construct new forward tees per the tee equity plan
B. Remove a few trees behind this green to open up a view of
the historic cottonwood trees.
C. Construct a new naturalized drainage channel along the
left side of the expanded green to create a different hazard
value on this par 3.
D. Construct new green complex maintaining the large
terrace on the green but expanding the size of the lower
level to the players left to create a more playable/puttable
green.

