Page 27 - 21-03-23-Conceptual Master Plan to Share_Neat
P. 27

INSPIRATION:
               TUCKER PLATEAU



               ARCHITECT’S NOTES:


               A.         Construct new forward tees per the tee equity plan

               B.         Remove a few trees behind this green to open up a view of
                          the historic cottonwood trees.

               C.         Construct a new naturalized drainage channel along the
                          left side of the expanded green to create a different hazard
                          value on this par 3.

               D.         Construct new green complex maintaining the large
                          terrace on the green but expanding the size of the lower

                          level to the players left to create a more playable/puttable
                          green.