Page 47 - 2021_AR_Neat
P. 47

ENVIRONMENTAL












                                                   ENVIRONMENTAL STEWARDSHIP TAKES CAREFUL PLANNING
                                                   In 2021 the Port of Stockton worked hard to       benefits for invertebrates, amphibians, birds, and
                                                   recognize and reduce our environmental impact     mammals by providing the ingredients necessary
                                                   and plan for more significant initiatives in the   for food webs, breeding, and refuge needs of
                                                   coming years. We are happy to share               many species. The Project also acts as a natural
                                                   environmental successes we experienced in         reservoir, providing climate change resiliency in
                                                   2021, including innovative planning underway for   the form of flood hazard controls and safeguards
                                                   environmental enhancements in the future.

                                                   Enhancement of the Eastern South Ditch             “WHILE THE PORT RECOGNIZES
                                                   The Port’s South Ditch is a concrete channel that   THERE ARE STILL MANY
                                                   conveys stormwater nearly 3,000 feet to a
                                                   retention basin where it is periodically pumped     OPPORTUNITIES TO IMPROVE
                                                   and returned safely to the San Joaquin River. In    ENVIRONMENTAL CONDITIONS
                                                   2019 and 2020, the Port completed design and
                                                   permitting with state and federal agencies for the   AT THE PORT, WE TAKE PRIDE
                                                   Eastern South Ditch Enhancement Project             IN THE STEPS WE HAVE TAKEN
                                                   (Project). With grant assistance from the California   TO PROMOTE CHANGE.”
                                                   Natural Resources Agency, the Port successfully
                                                   completed construction of the Project in 2021.
                                                   Now, the easternmost 400-foot portion of the      against droughts. Soon it will even serve as a
                                                   South Ditch has been transformed into a natural,   natural area where employees can relax and
                                                   vegetated waterway, treating runo  with soils and   enjoy the view. The restored area benefits the
                                                   plants, reducing stormwater volume, and           environment, the Port, and the surrounding
                                                   promoting groundwater recharge.                   community in multiple ways, and in the future, the
                                                                                                     Port intends to implement other similar
                                                   But the Project is more than just a filter. The    stormwater enhancement projects.
                                                   wetland and riparian planted areas o er habitat



                                                                                                                                                           45
   42   43   44   45   46   47   48   49   50   51   52