Page 26 - ARCHITECTURE SITE PRACTICE
P. 26

COST ESTIMATE








                  This portion of the construction contract agreement provides a
                  breakdown of all items being incorporated into the construction
                  project and their costs. The cost estimate can be detailed per
                  item in a document that combines specifications and costs, or
                  in a lump sum form that doesn't specify individual items.


                  Sometimes an itemized Cost Estimate is combined with the
                  Specifications in a single








































































                                                                                                                  21
   21   22   23   24   25   26   27   28   29   30   31