Page 78 - The Iron Games E-book
P. 78

The Iron Games                            Powerlifting
               7.  Makes proposals to the IPF General Assembly for the
                   withdrawal of an international referee’s card when it
                   deems such action necessary.
               8.  Publishes via the Executive, material of a technical
                   nature  that  deals  with  training  methods  and
                   performance of competition lifts.
               9.  (a)  Will be responsible for inspecting all competition
                   and personal equipment as defined in the handbook.
                   Also equipment that has been submitted by various
                   manufacturers for the sole purpose of being able to
                   use  the  words  “IPF  Approved”  in  their  commercial
                   advertisements. If the item or items submitted meet
                   all  current  IPF  rules  and  regulations,  and  the  IPF
                   Executive Committee agrees with the decision of the
                   Technical  Committee,  a  fee  for  each  item  shall  be
                   levied  by  the  IPF  Executive  and  a  certificate  of
                   approval will be issued by the Technical Committee.
               (b)  At the end of each year, a renewal fee for each item
                   as levied by the IPF Executive must be submitted to
                   the IPF for purposes of re-certification of approval. If
                   the  design  has  been  changed,  the  item  must  be
                   submitted to the Technical Committee for inspection
                   and recertification.
               (c)  If,  at  any  time  after  the  certificate  of  approval  has
                   been issued, the manufacturer changes the design of
                   the  competition  or  personal  equipment  that  was
                   previously  submitted  for  approval  and  it  no  longer
                   meets current IPF rules and regulations, the IPF shall
                   withdraw  approval.  The  IPF  will  not  issue  another
                   certificate  until  changes  in  design  have  been
                   corrected  and  the  item  or  items  submitted  to  the
                   Technical Committee for inspection.









                                          61
   73   74   75   76   77   78   79   80   81   82   83