Page 14 - PPTL.QM.001 Iss 01 - ISO 9001 Quality Manual - Full [Unsigned]
P. 14
QUALITY MANUAL
PHILLIPS PHARMACEUTICALS (TANZANIA) LIMITED
DOCUMENT NUMBER ISSUE NUMBER SUPERSEDES EFFECTIVE DATE
PPTL/QM/001 02 01 14.12.2018
7.0 SUPPORT
7.1 RESOURCES
7.1.1 GENERAL
PPTL has determined and provided the resources needed for the establishment, implementation, maintenance and
continual improvement of the QMS. The organization has considered the capabilities of, constraints on, existing
internal resources and what needs to be obtained from external providers.
The PPTL management provides the resources needed to develop, implement and continually improve the
processes of the Quality Management System and to address and enhance customer satisfaction in a timely
manner to ensure requirements are met.
7.1.2 PEOPLE
The organization has determined and provided the persons necessary for the effective implementation of its QMS and
for the operation and control of its processes (see Appendix VIII – PPTL/QMS/QA/024). PPTL ensures that personnel
performing work affecting the company’s Quality Management System are competent on the basis of
applicable education, training, skills and experience, see SOP Number PPTL/SOP/HR/001 and
PPTL/SOP/HR/006.
PPTL is staffed by a blend of experienced personnel including pharmacists who are skilled in their areas of
operation. The hierarchical structure of PPTL Company is as shown in Appendix VIII – PPTL/QMS/QA/024. PPTL
ensures that the responsibilities, authority and the interrelation of all personnel who manage, perform and
verify work affecting quality are defined and communicated in order to facilitate effective quality management.
All key personnel have been given authorities and responsibilities to enable them to assist in the achievement
of the quality objectives. This assignment of authority and responsibility helps to establish involvement and
commitment of people throughout Phillips Pharmaceuticals (Tanzania) Limited.
The responsibility of personnel is given. An individual may be appointed with a dual role (within the Phillips
Pharma Group Tanzania), in such cases he/she will be responsible for fulfilling the tasks assigned to both roles.
The company issues job descriptions to personnel and maintains a copy in personnel records as stated in SOP
Number PPTL/SOP/HR/003 – Staff Record Maintenance.
7.1.3 INFRASTRUCTURE
PPTL has determined, provided and maintained an infrastructure necessary for the operation of its processes and to
enable it achieve conformity of products and services. These resources include:
• Warehouses for storage of products at ambient temperature, cold rooms, refrigerators, freezer room, freezers
for products that require cold storage.
• Equipment example: hand pallets, trolleys and pallet shifters.
• Transportation resources in terms of vans, trucks and motor bikes.
• An enterprise resource planning system, internet and phone services for information management and
communication.
The Distribution Hub Manager in collaboration by Quality Assurance Manager, with support from the Management
Team determines, provides and arranges maintenance for the infrastructure needed to achieve the conformity of the
service requirements, including buildings, workspace and associated facilities, process equipment such as cold room,
computer hardware and software, communication media, transport and supporting services.
P a g e 13 | 28

