Page 13 - PPTL.QM.001 Iss 01 - ISO 9001 Quality Manual - Full [Unsigned]
P. 13

QUALITY MANUAL





                                                                            PHILLIPS PHARMACEUTICALS (TANZANIA) LIMITED



            DOCUMENT NUMBER                                        ISSUE NUMBER                                          SUPERSEDES                                   EFFECTIVE DATE

                  PPTL/QM/001                                                  02                                                 01                                      14.12.2018



           6.3       PLANNING OF CHANGES

           When PPTL determines the need for changes to the QMS, the changes shall be carried out in a planned manner. The

           following consideration shall be made:

                 •      The purpose of the changes and their potential consequences.

                 •      The integrity of the Quality Management System.

                 •      The availability of resources.

                 •      The allocation or reallocation of responsibilities and authorities.


           PPTL has established a Change Control Procedure, PPTL/SOP/QA/007 to ensure that all major changes related to the

           maintenance  of  the  PPTL  QMS  and  Good  Distribution  Practice  are  reviewed,  approved  and  communicated

           appropriately before implementation.












































































































                                                                                                                                                                       P a g e  12 | 28
   8   9   10   11   12   13   14   15   16   17   18