Page 13 - PPTL.QM.001 Iss 01 - ISO 9001 Quality Manual - Full [Unsigned]
P. 13
QUALITY MANUAL
PHILLIPS PHARMACEUTICALS (TANZANIA) LIMITED
DOCUMENT NUMBER ISSUE NUMBER SUPERSEDES EFFECTIVE DATE
PPTL/QM/001 02 01 14.12.2018
6.3 PLANNING OF CHANGES
When PPTL determines the need for changes to the QMS, the changes shall be carried out in a planned manner. The
following consideration shall be made:
• The purpose of the changes and their potential consequences.
• The integrity of the Quality Management System.
• The availability of resources.
• The allocation or reallocation of responsibilities and authorities.
PPTL has established a Change Control Procedure, PPTL/SOP/QA/007 to ensure that all major changes related to the
maintenance of the PPTL QMS and Good Distribution Practice are reviewed, approved and communicated
appropriately before implementation.
P a g e 12 | 28

