Page 251 - KOMPILASI PBL (PROJECT-BASED LEARNING) VERSI PKP PPD TAWAU
P. 251
Implementation Phase
• Student do the project decided
• Student prepare the report for the project via power
point presentationStudent do self-evaluation and also
refers the rubric provides by the teacher and
communicate with the teacher for improvement.
Evaluation Phase • Student do self-evaluations by referring the rubric and
using the check list instrument.
• Student do checks for the project to answer allthe
curriculum questions
• Student sends the project prepared to theteacher
through e-mail.
• Teacher evaluates student’s project and
communicate with the student fornecessary
improvement.
Artifact / Product Created Power point slides include a short video.
Product link in google drive:
https://drive.google.com/file/d/
1k6gjC8jmIa2oxbbaKIVi20
IOs3QHOByr/view?usp=sharing
Instrument / Rubric Used
251

