Page 44 - SP015 Past Years PSPM Chapter 1 -5 Ver.2020
P. 44

PHYSICS PSPM SEM 1  1999 - 2017


                             PSPM CHAPTER 5:  WORK, ENERGY AND POWER
               ___________________________________________________________________________

               Work

                     UPS 2013/2014  SF016  No. 4(a)(i)  Edited

               1.    Define work done and state its SI unit.                                        [2 m]



                     PSPM 2005/2006  SF017/2  No. 10(b)

               2.


                                                                    30



                                                       FIGURE 5.1

                     A  man  pulls  a  45  kg  block  at  constant  velocity  on  a  rough  surface  as  shown  in
                     FIGURE 5.1. The angle between the rope and the horizontal is 30 and the coefficient
                     of kinetic friction between the block and the surface is 0.6.
                     (a)  Sketch and label all the forces acting on the block.                      [2 m]
                     (b)  Calculate the tension in the rope.                                        [3 m]
                     (c)  Calculate the work done on the block if the distance travelled is 3 m.    [4 m]


                     UPS 2007/2008  SF017  No. 4(a)(i)

               3.    You lift a book with your hand in such a way that it moves up at constant speed. While
                     it is moving, the total work done on the book is zero. Explain.                [2 m]


                     UPS 2014/2015  SF016  No. 4(a)(ii)

               4.                          F (N)

                                              31



                                               0                           s (m)
                                                           3         6
                                                       FIGURE 5.2

                     FIGURE  5.2  shows  a  graph  of  resultant  force  F  against  displacement  s  of  a  8  kg
                     trolley. Determine the total work done on the trolley.                         [3 m]



                                                           44
   39   40   41   42   43   44   45   46   47   48   49