Page 68 - 9 teachers social book 9 @ 2077 ctp_Neat
P. 68

8.    Extensive report will be prepared on Pancheshwor and Sapta Koshi hydro projects.
                 While carrying such big projects, climatic aspect will be given due consideration.
           9.    The concept of “Sustainable Energy Power for All” and “Rural Electrification”
                 will be promoted for increasing accessibility of electricity at rural area.
           10.   A process will be initiated  to link small and micro hydro projects to the
                 national grid.



                   Activity


                     Draw a picture showing the process of generating hydroelectricity. Take the help
                     of your teacher.





                                              Exercise


           1.    What is energy?
           2.    Why is energy considered as the infrastructure of development?
           3.    What is the importance of electricity?
           4.    Explain the major plan of government to increase the potentiality of electricity.
           5.    “Nepal’s average annual per capita energy (electricity) consumption is 161KW
                 (CBS 2013) one of the lowest consumption in South Asia.” Give reasons.
           6.    Mention any five problems on electricity generation in Nepal.






             Community Work


               1.    Visit any hydro-power project lies nearby your area. Observe everything in details and
                     prepare the report on it to present in the class.
               2.    Write an article on "the steps taken by the Nepal Electricity Authority to resolve load
                     shedding problem is praiseworthy".















             Dynamic Social Studies - Book IX      68
   63   64   65   66   67   68   69   70   71   72   73