Page 128 - Budget Book FY2020-2021
P. 128

General Fund

                                                                                                 Drainage
                                                                              www.mcallen.net/publicworks/drainage
             Mission        Department Summary
           Statement:                                          Actual      Adj. Budget    Estimated    Budget

          Dedicated to keeping   Expenditure Detail:           18-19        19-20        19-20        20-21
             all drainage   Personnel Services
          ways/ditches, safe,     Salaries and Wages       $         618,879  $    700,120  $    700,120  $    740,651
         clean and performing     Employee Benefits                183,937      236,417      236,417      255,386
          at their engineered   Supplies                            20,422       20,000       20,000       20,052
           design criteria for   Other Services and Charges        232,705      207,067      207,067      268,989
             storm water    Maintenance                            358,852      356,000      356,000      289,049
          management.  This
            service shall be
          provided with a safe,   Operations Subtotal             1,414,794      1,519,604      1,519,604      1,574,127
         professional, reliable,     Capital Outlay                  12,707         2,875        2,875           -
         efficient, and eager to   Total Expenditures      $      1,427,501   $      1,522,479   $      1,522,479   $      1,574,127
                            PERSONNEL
           help disposition.
                            Exempt                                       2             2            2            2
                            Non-Exempt                                 18            18           18           18
                            Total Positions Authorized               20           20           20           20
           Contact Us:                                 MAJOR FY 20-21 GOALS
             Elvira Alonzo  1.) Continue stormwater management of the City's drainage system for compliance with the MS4 permit in
         Public Works Director  reducing stormwater runoff and improving water quality.
         4201 N. Bentsen Road  2.) Establish (2) drain ditch locations for installation of litter prevention structural controls.
          McAllen, TX 78504  3.) Optimize use of technology to evaluate operational procedures, quadrant scheduling, and work order
            (956) 681-4000  submittals.
                            4.) Drainage Channel Maintenance Access Improvements. (6.3.5)
                            5.) Continually remove weed/tree growth and garbage in open drainage facilities. (6.3.3)



          Description:      Performance Measures
            The Drainage                                       Actual        Goal       Estimated      Goal
           Department is a                                    FY 18-19     FY 19-20     FY 19-20     FY 20-21
           division of Public   Inputs:
          Works.  Through its
          staff of 20 employees   Number of full time employees      20            20           20           20
            the department   Department Expenditures       $        1,427,501  $        1,522,479  $        1,522,479  $        1,574,127
           maintains all city   Number of storm inlets               16,562       16,562       16,562       16,562
          owned drain ditches   Ditch inventory - miles                 25           25           30           30
            and drainage
         infrastructure to allow   City ROW/Property - acres           1,304        1,304         1,304        1,304
         for proper storm water   Outputs:
           management in    Number of manholes cleaned per year         502          450          520          500
         compliance with storm   Number of storm inlets cleaned per year         3,439         3,000        3,500        3,500
            water pollution
             prevention     Excavator/drainage linear miles cleaned        9.4      10.0         30.0         30.0
             regulations.    ROW mowing - acres                      13,582       13,000       14,000       13,500
                            Collection system cleaned - linear feet          100,233       81,000     110,000         100,000
                            Box Culvert Crossings Cleaned               10           10           16           10
                            Requests for service                        229          350          180          200
                            Storm/emergency incident response             5            4            2            1
                            Number of drain ditch inspections per year  n/a         50            50           100















                                                          -78-
   123   124   125   126   127   128   129   130   131   132   133