Page 47 - JKR HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT 2021 EDITION_Neat
P. 47

SECTION 5.0 – ARCHITECTURAL COMPONENTS, MATERIALS AND FINISHES                                                         SECTION 5.0 – ARCHITECTURAL COMPONENTS, MATERIALS AND FINISHES



                                  m) Walls for operating theatres equipped with  radiation and X-ray                                                     g)  The drywalls shall be well insulated to maintain the indoor temperatures
                                     equipment shall have a minimum thickness of 2.0 mm lead equivalence                                                    while preventing condensation problems on the outside wall surfaces
                                     of   radiation   protection  and    in   compliance    with   related                                                  and for sound insulation purposes.
                                     standards/guidelines and obtained approval by  Bahagian Kawalselia
                                     Radiasi Perubatan, MOH.                                                                                             h)  In a location where drywalls adjoin wet areas, adequate waterproofing
                                                                                                                                                            shall be applied to the surfaces up to a specified height according to the
                                     For example: If application of brickwork with 25 mm thick barium plaster                                               manufacturer’s specification.
                                     of approved composition for radiation and in  compliance with the
                                     relevant authorities’ requirements applied, the wall shall be painted.                                              i)  The drywall system shall comply with all fire requirements and the other
                                                                                                                                                            requirements under the UBBL.
                                  n)  For X-ray rooms with X-ray equipment up to 150 kV and radiotherapy
                                     treatment  rooms  or  other  areas  as  required,  the  walls  shall  have  a                                       j)  Drywall partitions shall be provided for non-clinical areas only.
                                     minimum thickness of 2.0 mm lead equivalence of radiation protection
                                     and  in compliance with  related standards/guidelines and obtained
                                     approval by Bahagian Kawalselia Radiasi Perubatan, MOH.
                                                                                                                                               5.5          COMPARTMENT WALL
                                  o)  For radiotherapy rooms or areas, which have  special radiotherapy
                                     equipment, special walls made of thicker reinforced concrete shall be                                     5.5.1     All compartment walls shall comply with the JBPM’s fire requirements and
                                     designed in compliance with related standards/guidelines and obtained                                               adhere to the UBBL. All openings in a compartment wall shall be fitted with
                                     approval by Bahagian Kawalselia Radiasi Perubatan, MOH.                                                             fire-rated doors and shall comply with the UBBL. The fire-rated doors shall
                                                                                                                                                         be installed with the Détente system for any patient movement area, and
                                                                                                                                                         according to the Client’s requirement and the PD’s concurrence.
                        5.4.3     Drywall Partition

                                  a)  When  used,  the  drywall  partition  system  shall  be  strong  and  stable                             5.6       CEILING
                                     enough to support built-in furniture and any other fittings or equipment
                                     necessary for the building’s space effective functioning.                                                 General

                                  b)  Drywall shall be thermal and sound insulated for the proper functioning                                  5.6.1     Ceiling specification shall comply  with  the fire spread  classification as
                                     of space.                                                                                                           stipulated in the 8th Schedule of UBBL 1984.

                                  c)  Drywall partition shall be supplied and installed by a drywall specialist.                               5.6.2     Ceiling boards shall be asbestos-free.
                                     The drywall system’s construction shall strictly adhere  to  the
                                     manufacturers’ method statement of the installation process.                                              5.6.3     The suspended grid ceiling system shall be of the proprietary system. The
                                                                                                                                                         construction shall comply with the design requirements for strength,
                                  d)  Drywall system utilising cement-fibre board, gypsum board, anodised                                                serviceability, stability, performance, and durability as specified in the latest
                                     aluminum alloy, epoxy-coated steel or stainless steel wall panels,                                                  JKR Standard Specification for Building Works.
                                     mounted on a galvanised steel framework.
                                                                                                                                               5.6.4     Ceilings  of  the operating  theatres’  department,  CSSD, and  other  sterile
                                  e)  The wall panels shall be painted unless otherwise stated, and the joints                                           areas shall be seamless with alcove edge (for OT Room only), a minimum
                                     well sealed before painting. The drywall shall be  fabricated with  the                                             of 12.5  mm thickness,  moisture-resistant  and fire-resistant gypsum
                                     coordination of mechanical and electrical services at an early design                                               plasterboards  of  approved  quality.  All  lighting,  air-conditioning,  fire
                                     stage.                                                                                                              protection, and other service outlets shall be integrated design and flushed
                                                                                                                                                         with plaster ceiling.
                                  f)  When used, large prefabricated panels shall conform to MS 1313:1993
                                     Code of Practice on Large Prefabricated Panels.                                                           5.6.5     All plaster ceiling joints shall be sealed with tapes and trowel finished with
                                                                                                                                                         gypsum plaster  to  the manufacturer’s recommendation. The finished




                                                                                                        38                                                                                                                     39
                        2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT                    2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT
   42   43   44   45   46   47   48   49   50   51   52