Page 12 - Modern Steel Construction (April 2019)
P. 12

This month’s Steel Quiz focuses on seismic design. The answers can all
         steel           be found in the 2016 AISC Seismic Provisions for Structural Steel Buildings

           quiz
                         (ANSI/AISC 341, available at www.aisc.org/speci  cations).



         1 True or False: If a fabricator notifies the   c.  Welds joining box section elements  4 True or False: Seismic drift limits,
           engineer of record (EOR) that ASTM   d. Beam flange and web CJP welds   which are commonly used to ensure
           A709 is readily available for hot-rolled   to columns                 the serviceability of a structure, are
           sections used in the seismic force-  3 For the square, moderately  ductile   regarded as a matter of judgement
           resisting system (SFRS) for a project   encased composite column shown   rather than absolute design limits.
           where the requirements in the  AISC   in Figure 1, what is the maximum   5 Buckling-restrained braced
           Seismic Provisions  need to be met,   spacing of transverse reinforcement
           this is acceptable so long as the EOR   at the top and bottom?        frames (BRBFs) provide significant
                                                                                 inelastic deformation capacity
           fully evaluates the suitability based
                                                              W14x132
           on strength properties, ductility,            W14×132       #3        through yielding and shall be
                                                                                 designed, tested and detailed
                                                                        #3 TIE BARS
           formability, soundness, weldability,                        TIE
           notch toughness and corrosivity,                            BARS      to accommodate at least what
                                                                                 expected deformation?
           among other considerations.
                                                                               6 True or False.  K-braced frames are
         2 Which of the following are not listed                                 allowed to be used as an SFRS so long
           in the  Seismic Provisions as special
           moment frame (SMF) demand-critical                          #8        as the additional brace post-buckling
                                                                       BARS
                                                                                 forces are accounted for through
                                                                       #8 BARS (TYP.)
           welds?                                                      (TYP.)
           a. Column-to-base plate connections                                   inelasticity similar to the link in an
                                                                                 eccentrically braced frame (EBF).
           b. Column splice groove welds
                                                        1'-10"
                                                       1’-10“                  TURN TO PAGE 14 FOR THE ANSWERS

                                                                                FABRICATION

                                                                          PERFORMANCE



             UNMATCHED PRODUCTION.

             AUTOMATED CNC MACHINERY.
             RELIABLE SERVICE AND SUPPORT.














                                                                                VOORTMAN USA
                                                                       26200 S. Whiting Way  +1 708 885 4900
                                                                           Monee, IL 60449  info@voortmancorp.com
                                                                     United States of America  www.voortmancorp.com


                             WWW.VOORTMANCORP.COM


        12 | APRIL 2019
   7   8   9   10   11   12   13   14   15   16   17