In this method, the member is removed
        from the machine after the initial bend is
        completed, turned over and placed back into
        the same machine, or a different machine,
        to complete the second bend. Due to the
        difficulty in fitting the member into the
        machine after the first bend is completed,
        a straight segment between the tangent
        points of each curve may be required. The
        minimum straight segment length varies
        with the member geometry and the bend-
        ing machine; therefore, the bender-roller
        company should be consulted for specific
        requirements. S-curves can also be formed



























                                                             Steel Just Got

                                                       Smarter





        Curved steel can transform bridges, like the        with a consistent,
        41st Street pedestrian bridge in Chicago
        (above) and Calgary’s George C. King Bridge
        (below), from merely functional crossings to        quality connection
        iconic, artistic spans.
                                                            design service and
                                                            the Qnect team on
                                                            your team.



















                                                                                           Modern Steel Construction | 45