Page 93 - Knit Now - Issue 112 (January 2020)
P. 93

THE BASICS


         Yarn over (yo)











         Between knit sts: Start with   Between purl sts: With the yarn   Between a knit and a purl st:   Between a purl and a knit st:
         yarn at back. Bring yarn forward   at the front of the work, take it   Start with yarn at back. Bring   Start with yarn at back. Take
         from back to front between the   from front to back over the top of   yarn forward between the   yarn back over top of RH needle
         needles and back over the   the RH needle, continue round,   needles, take from front to back   and then bring it between the
         RH needle.                  under RH needle, and hold to   over the top of the RH needle,   two needles so that the yarn
                                     front ready to purl next st.  round RH needle and hold to   is not at the back of the work.
                                                                front to purl next st.      Knit next st.
        Slip, slip, knit (ssk)                                                               Make one (m1)












         Step 1: Insert the RH needle   Step 2: Insert the RH needle   Step 3: Insert the tip of the LH   Step 1: Insert LH needle
         into the next st k-wise, then slip   into the next st p-wise, then slip   needle from left to right up into   from back to front below
         it onto the RH needle without   onto the RH needle. You have 2   the front of the two slipped sts   the strand between the two
         knitting it.                slipped sts on the RH needle, 1   (the RH needle is behind the LH   needles, lifting the strand
                                     slipped k-wise, 1 slipped p-wise.  needle). Knit these two sts tog.  onto the LH needle.
        Central double decrease (cdd)











         Step 1: Insert RH needle from   Step 2: Knit the next st on LH   Step 3: Insert the tip of the LH   Step 2: Insert the tip of
         front to back into next 2 sts   needle. Note that the two slipped   needle from left to right into the   the RH needle from front to
         on LH needle. Slip these two   sts are sitting unworked behind   front of the two slipped sts and   back into the front of the
         sts k-wise tog onto RH needle   the st you have just knitted.  lift the two slipped sts over the   new loop on the LH needle.
         without knitting them.                                 knitted st.                   Knit this st.

         Long-tail cast-on











         Step 1: Make a slipknot, leaving   Step 2: Holding working yarn   Step 3: Use RH to bring tail yarn   Step 4: Lift loop on left thumb
         a long tail of yarn approximately   tensioned with LH ingers, hook   up under needle, from right to   over tip of needle, remove thumb
         three times the length of the   left thumb under working yarn   left. Take it between thumb and   and draw up working yarn. Two
         cast-on edge. Place slipknot   from back to front. Insert the tip   needle, over the top of the needle,   sts on RH needle (slipknot
         on needle and draw up. Hold   of the needle into front of loop on   and hold tensioned to right. You   counts as one st). Repeat steps
         needle in RH.               left thumb. Tail yarn is still held   should wrap the yarn clockwise   2-4 until number of sts required
                                     tensioned in RH at this point.  around the needle as if to knit.  has been cast on.

                                                                                                  www.knitnowmag.co.uk   93
   88   89   90   91   92   93   94   95   96   97   98