Page 50 - HeliOps Frontline Issue 26
P. 50

50   HELIOPS FRONTLINE  /  ISSUE 26  /  2019













































                                               3.  Networking. Enhancing and hardening C2 against EMS-denial
                                                  and cyber-attack.

                                               4.  Soldier Lethality (SL). New weapons, armour and integrated
                                                  systems for the ‘boots on the ground’, including use of wearable
                                                  technology and micro-UAVs.

                                               5.  Air and Missile Defense (AMD). New systems to replace Patriot,
                                                  detect/destroy enemy aircraft and UAVs and, potentially, some
                                                  form of ‘Iron Dome’ ballistic weapon protection.

                                               6.  Future Vertical Lift (FVL). Higher speed, longer-range and
                                                  improved survivability on the battlefields of the future.

                                                  In terms of priority, the Army places FVL 3rd in the list, behind
                                               LRPF and NGCV. However, this ambitious re-equipment programme
                                               is already significantly ‘overheated’ in terms of affordability. As
                                               always, quoting figures is a dangerous game, but it seems that the
                                               Army is planning on spending some $3Bn per year over its budget
                                               request for the next 5 years on new equipment. Savings therefore
                                               have to be made.

                                               JMR


                                                  Which circles us back to the CH-47F Block II. Whilst, notionally,
                                               the heavy lift requirement is included in FVL as Joint Multi Role-
                                               Heavy (JMR-H) and JMR-Ultra (JMR-U) neither concept is being
   45   46   47   48   49   50   51   52   53   54   55